1.2
Prerequisites to Use
Prior to the commissioning and use of this product, all personnel involved in its
installation, operation and maintenance must be deemed competent and have:
l
Read and understood the information contained within this manual
l
Received the relevant training with regard to safety and operation of the product
l
Been provided with the appropriate PPE (Personal Protective Equipment) required
for the safe operation of this product
Note:
The customer is responsible for ensuring that all of the above conditions are
satisfied before the product is commissioned for use.
Note:
Unless otherwise specified, the customer is responsible for the
installation of this product and the safe connection of any additional
equipment and gas or liquid supply lines.
Note:
Throughout this manual, written instructions are accompanied by
diagrams. Diagrams may be highlighted in different colours and do not
reflect the actual colouration of the product.
Parts that are to be moved are highlighted in
YELLOW
and are intended to
be fixed to, or removed from, surfaces highlighted in
BLUE
. Where
applicable, arrows show the direction of movement.
7
Summary of Contents for GPCMA 174
Page 23: ...23...
Page 48: ......
Page 49: ...Notes Service Record Engineer Name Date Record of Work...