l
The customer must provide an adequate ventilation and fume extraction system to
manage any fumes given off by materials during processing
The customer is responsible for providing and maintaining the connections for the
electrical power supply, inert gas supply, and cooling water supply and drain. The
furnace should not be operated until all required supplies are connected.
This product should not be modified or used for any purpose other than that for which it
is intended.
6
Summary of Contents for GPCMA 174
Page 23: ...23...
Page 48: ......
Page 49: ...Notes Service Record Engineer Name Date Record of Work...