Instruction manual SP611 / SP911
Please keep this instruction manual for future reference
11
INSTRUCTIONS FOR INSTALLATION
Before you start
- Read this manual carefully and completely.
- The cooker hood conforms to related appliances standards. Please check your
local building codes for any additional requirements.
- The appliance has been manufactured as class I, therefore earthed connection is
necessary. The cooker hood must be installed so that the plug is easily accessible.
Planning your installation
- Measure the floor to ceiling height. This hood can be installed on walls between
8ft and 9ft tall.
- Find the centre point of your opening. Mark a plumb line through this point from
ceiling to your range/hob.
- Check your range/hob user manual for the minimum distance above your
cooking surface. The minimum distance between any element or flame height
and the nearest combustible surface is 61cm.
- Decide where the ductwork will run between the hood and the outside. Short,
straight duct runs will provide the most air flow.
- If a recirculating kit is required (Code: CAP24CF), you may purchase one through
your dealer or visit www.caple.co.uk.
SP611BK-SP911BK - Instruction Manual.indd 11
22/03/2016 15:02