Please keep this instruction manual for future reference
Instruction manual VAP2/3IN1, VAPQ2/3IN1, JOY3IN1
15
J OYA 3 I N 1 I N S TA L L AT I O N
»
The power outlet must be correctly earthed and also be able to be isolated by a switch.
»
Use a separate circuit for the boiler, which is also correctly earthed.
»
The tap and handles can be installed into the sink or the worktop using 35mm cutout holes.
»
Install the water boiler vertically, it must not be placed on its side. It can be stood on the base
of the cabinet, but it is recommended to fix the boiler in position using the brackets provided.
I N S TA L L AT I O N S T E P S
1. Install the tap onto the sink or the worktop as shown below, and tighten the fixing screw.
Diameter of cut outs = 35mm