14
Step 5
:
Attach the top cable (72) with the 4”
pulley (70). Then attach pulley to the Top
frame (2) use bolt (25), washers (51),
plastic bushings (64) and nut (45).
Attach carabiners (76) to either end of the
chain (74). Then open carabiners to fit lat
bar attachment and attach the other end to
the ball end of the top cable (72), as shown.
(
TOP CABLE
has a screw connected at
one end and a ball on the other end)
Step 6
:
Pull the top cable (72) and align it
with the top of the 4” pulley (70). Insert the
pulley into space at the top frame (2) and
then tighten with parts (35, 51, 64, 45)
Bring the top cable (72) through again and
align it inside press arm junction (5) and
tighten, as shown.
Continue these steps to assemble the next
pulley which is attached to the main frame
support (1).
Step 7: Using the excess cable from the
last step, place the cable
underneath
the 4”
pulley wheel and attach and secure the
pulley bracket B (27), as shown.
Continue assembly with the same cable
and place it
above
the 4” pulley wheel, then
attach it to the hanging teeth on the top
frame (2), as shown.
Step 8
:
Pull the end of the cable and screw
it into the top plate (77) using the washer
(75).