20
14
15
13
90
21
24
23
22
84
29
25
26
27
28
30
31
33
32
34
36
35
30
39
27
28
37
28
27
42
33
43
30
53
30
28
27
54
30
55
57
58
40
41
59
28
60
28
61
66
67
66
63
64
65
68
27
28
69
62
69
28
27
68
92
93
72
71
70
73
70
71
72
71
70
70
71
72
74
91
76
77
94
79
80
78
78
24
95
77
81
24
36
52
82
96
75
51
56
TORQUE 8 Nm
TORQUE
25 Nm
85
83
86
87
12
11
10
9
8
7
6
5
18
17
17
1
2
88
89
33
19
16
TORQUE 20 Nm
TORQUE 20 Nm
TORQUE 20 Nm
TORQUE 12 Nm
TORQUE 12 Nm
TORQUE 1Nm
TORQUE 20 Nm
TORQUE 1Nm
3
4
38
38
44
45
46
47
50
49
48
EXPLODED-VIEW DRAWINGS:
50
EXPLOSION DRAWING & SPARE PART LIST
Summary of Contents for SPECTRAL:ON CF7
Page 9: ...9 1 UNPACKING 1 3 1 2 1 1 1 5 1 4 ...
Page 10: ...10 1 UNPACKING X 2 X 3 X 1 X 4 1 8 1 7 1 6 1 9 ...
Page 12: ...13 14 12 3 PREPARATION HANDLEBAR INSTALLATION 3 3 3 1 3 2 ...
Page 13: ...6 Nm 13 4 HANDLEBAR INSTALLATION ST31 4 5 4 4 4 3 4 2 4 1 ...
Page 14: ...2 2 1 2 min 2 Nm 1 6 Nm 2 9 Nm 14 5 HANDLEBAR INSTALLATION CP12 5 4 5 5 5 2 5 3 5 1 ...
Page 15: ...9 Nm min 2 Nm 15 COCKPIT HEIGHT ADJUSTMENT OPTIONAL 1 2 3 ...
Page 16: ...1 6 Nm 2 9 Nm 16 COCKPIT HEIGHT ADJUSTMENT OPTIONAL 4 ...
Page 17: ...Nm CONNECT DISCONNECT 17 6 CONNECTING DISPLAY AND DROPPER REMOTE 6 2 6 1 6 3 ...
Page 18: ...R L 18 7 PEDAL INSTALLATION X 2 X 1 7 1 7 2 7 3 ...
Page 19: ...19 8 SEATPOST ADJUSTMENT 8 3 8 2 8 1 ...
Page 21: ...m a x m i n 0 to 5 21 9 SADDLE ADJUSTMENT 9 2 9 3 9 1 ...
Page 23: ...23 11 TIRE PRESSURE ...
Page 24: ...24 12 DISCONNECTING BATTERY CHARGING 13 1 12 1 12 3 12 2 ...
Page 25: ...1 5 SEC 10 40 C 0 40 C 0 C 25 12 DISCONNECTING BATTERY CHARGING ...
Page 26: ...1 5 SEC 26 13 CONNECTING BATTERY SWITCHING BIKE ON OFF 13 2 13 3 13 1 ...
Page 39: ...YOUR BIKE S NOW PROPERLY MAINTAINED 39 MAINTENANCE ...
Page 40: ...SRAM Shimano 40 DISSASSEMBLY REAR WHEEL 2 3 1 4 ...
Page 41: ...SRAM Shimano 41 ASSEMBLY REAR WHEEL 2 3 1 ...
Page 42: ...42 BEFORE REMOVING BATTERY 4 2 3 1 ...
Page 43: ...1 2 3 1 2 43 REMOVE BATTERY OPTIONAL 5 4 2 3 1 ...
Page 44: ...1 2 3 8 Nm 44 INSTALL BATTERY OPTIONAL 5 6 4 2 3 1 ...
Page 51: ...READY TO RIDE CANYON SUPPORT CENTRE FOR UNBOXING AND ASSEMBLING SCAN HERE 51 ...