background image

Storage & Safety Guidelines 

To ensure maximum performance, store 

Canusa products in a dry, ventilated area. 

Keep products sealed in original cartons 

and avoid exposure to direct sunlight, rain, 

snow, dust or other adverse environmen-

tal elements. Avoid prolonged storage at 

temperatures above 35°C (95°F) or below 

-20°C (-4°F). Product installation should be 

done in accordance with local health and 

safety regulations.

These installation instructions are intended 

as a guide for standard products. Consult 

your Canusa representative for specifi c 

projects or unique applications.

Canusa warrants that the product conforms 

to its chemical and physical description 

and is appropriate for the use stated on the 

installation guide when used in compliance 

with Canusa’s written instructions. Since 

many installation factors are beyond 

our control, the user shall determine the 

suitability of the products for the intended 

use and assume all risks and liabilities in 

connection therewith. Canusa’s liability is 

stated in the standard terms and conditions 

of sale. Canusa makes no other warranty 

either expressed or implied. All information 

contained in this installation guide is to be 

used as a guide and is subject to change 

without notice. This installation guide 

supersedes all previous installation guides 

on this product. E&OE

Canusa-CPS

A division of Shawcor Ltd.

Head Offi ce 
25 Bethridge Road
Toronto, ON, Canada M9W 1M7
Tel: +1 416 743 7111
Fax: +1 416 743 5927

Canada
Dome Tower St. 2200, 
333-7th Avenue SW
Calgary, AB, Canada T2P 2Z1
Tel: +1 403 218 8207
Fax: +1 403 264 3649

Americas
5875 N. Sam Houston Pkwy W., 
Suite 200
Houston, TX, USA 77086
Tel: +1 281 886 2350
Fax: +1 281 886 2353

Middle East
ADPC - Mussafah Port, 
P.O. Box 2621
Abu Dhabi, UAE
Tel: +971 2 496 3500
Fax: +971 2 496 3501

Europe, Africa & Russia
Dellaertweg 9-E, Gebouw 
“Le Carrefour”
2316 WZ Leiden, 
The Netherlands (NL)
Tel: +31 71 80 802 70
Fax: +31 71 80 802 71

Asia-Pacifi c
101 Thomson Road, 
#11-03 United Square
307591 Singapore
Tel: +65 6749 8918
Fax: +65 6749 8919

Quality Management system 

registered to ISO 9001

Part No. 99060-204

IG_GTS-PE_rev019

17

Continue heating from the centre toward one 
end of the sleeve until recovery is complete. In 
a similar manner, heat and shrink the remaining 
side.

18

Shrinking has been completed when the 
adhesive begins to ooze at the sleeve edges 
all around the circumference. Finish shrinking 
the sleeve with long horizontal strokes over 
the entire surface to ensure a uniform bond.

19

While the sleeve is still hot and soft, use a hand 
roller to gently roll the sleeve surface and push 
any trapped air up and out of the sleeve, as 
shown above. Continue the procedure by also 
fi rmly rolling the closure with long horizontal 
strokes from the weld outwards.

With the green-yellow coloured adhesive side 
facing down, fi rmly press the entire closure 
seal into place. Ensure that the closure is 
centred evenly over the underlap-overlap 
sleeve seam. If necessary, add additional heat 
to the closure underside in cold conditions, 
using a low fl ame intensity.

14

15

Gently heat the closure and pat it down with 
a gloved hand. Repeating this procedure, 
move from one side to the other. Smooth any 
wrinkles by gently working them outward from 
the centre of the closure with a roller.

C

B

D

E

F

After shrinking is complete, allow the sleeve to cool to less than 90°C prior to laying (for offshore applications, product 
can be water quenched).

Onshore and Offshore Guidelines

16

Using the appropriate sized torch, begin at the 
centre of the sleeve and heat circumferentially 
around the pipe. Use broad strokes. If utilizing 
two torches, operators should work on 
opposite sides of pipe.

Pipe O.D.

450mm (18”)

1 torch

>450mm (18”)

2 torches

20

21

Test sleeve adhesion by gently pulling the 
edge of the backing back to ensure that the 
adhesive remains in place and is fully bonded 
to the factory coating. The sleeve is well 
bonded when the adhesive and coating remain 
intimately contacted. If required to improve 
bonding, additional heat should be applied to 
the sleeve.

Visually inspect the installed sleeve for the 
following:

•  Sleeve is in full contact with the steel joint.
• Adhesive 

fl ows beyond both sleeve edges.

•  No cracks or holes in sleeve backing.

Quality Check - Adhesion Test

Inspection

13

Wrap the sleeve loosely around the pipe, 
ensuring the appropriate overlap.

Before fi nishing wrapping the sleeve:

1. heat the backing side of the underlap until 
the backing starts to recover. Then use a roller 
to secure the underlap to the pipe.

2. gently heat the green-yellow coloured adhe-
sive side of the closure seal until it appears 
glossy.

 

1

 

2

Reviews: