20
O = Checked and no action needed.
X = Checked and executed action.
3
Daily Maintenance
3.1
Check the environment.
3.1.1 Check the print room conditions
3.1.2 Check the media storage conditions.
3.1.3 Check the supplies storage conditions.
4
Weekly Maintenance.
4.1
Check the ink handling.
4.1.1 Check the ink buffer reservoirs
4.1.2 Check the ink supply cans.
4.2
Check the maintenance
4.2.1 Check the manifolds
4.2.2
C
heck the Back Pressure Reservoirs
4.2.3 Check the degassing tray.
4.3
Check the print unit
4.3.1 Check the print-belt for contamination
4.3.2 Check the print-belt damage
4.3.3 Clean the inner-side of the print-belt
4.4
Clean the Registration units.
4.4.1 Clean the Z-registration sensors.
4.4.2 Clean the SZ-rollers.
4.4.3 Clean the segment-rollers.
4.5
Check the Paper Input Module
4.5.1 Check the PIM water bottle(s)
4.5.2
Check the alignment of the PIM’s and the HCS
4.6
Clean the paper path rollers.
4.6.1 Clean the paper path rollers of the HTU
4.6.2 Clean the paper path rollers in the Fixation.
4.6.3 Clean the paper path rollers in the HCS.
5
Monthly Maintenance.
5.1
Check the chillers.
5.1.1 Clean the heat exchanger of the chillers.
5.1.2 Check the level of the coolant.
5.2
Check the air system
5.2.1 Check the waste reservoirs of the air system
5.2.2 Check the air pressure
5.3
Clean the exterior of the system.
5.3.1 Clean the air grids of the system
Date:
Operator:
Summary of Contents for Oce VarioPrint i Series
Page 1: ...Ver 0 2 Level 1 Uptime Optimization Oc VarioPrint i series User Guide...
Page 23: ...23 7 Operator Notes Date Remark...
Page 24: ...24 Date Remark...
Page 25: ...25 Date Remark...
Page 26: ...26 Date Remark...
Page 27: ...27 Date Remark...
Page 28: ...28 Date Remark...