Chapter 2
2-6
2.2 Firmware
2.2.1 Operation Sequence at Power-on
0013-5399
The sequence of printer operations, from power-on to transition to online mode, is flowcharted below.
* This flowchart does not include the times spent supply inks and cleaning after leaving the printer for extended
periods of time.
F-2-5
Power Button ON
Device/resource
initializarion
Printhead/
ink tank check
Media feed system
initialization
Recovery system
initialization
Carriage position
initialization
Remaining ink level detection/
Waste ink level detection
Power-on
automatic recovery operation
Capping
Waiting for print operation
Initialization of software
Initialization of various devices
Engine status check
Engine startup status check
Previous power-off status check,etc.
Printhead installation status check
Ink tank installation status check
EEPROM check
Cassette pick-up unit initialization
Roll feed unit initialization
Roll feed unit initialization
Sensor check
Recovery system return to origin
Sensor check
Carriage motor return to origin
Summary of Contents for iPF710 - imagePROGRAF Color Inkjet Printer
Page 10: ...Chapter 1 PRODUCT DESCRIPTION...
Page 61: ...Chapter 2 TECHNICAL REFERENCE...
Page 113: ...Chapter 3 INSTALLATION...
Page 119: ...Chapter 4 DISASSEMBLY REASSEMBLY...
Page 155: ...Chapter 5 MAINTENANCE...
Page 162: ...Chapter 6 TROUBLESHOOTING...
Page 190: ...Chapter 7 SERVICE MODE...
Page 225: ...Chapter 8 ERROR CODE...
Page 233: ...APPENDIX...
Page 238: ......