Installation Time Table Continued
Item
Estimated Time
Super G3 FAX Board-AS1
7 minutes
Super G3 2nd Line Fax Board-AS1
21 minutes
Super G3 3rd/4th Line Fax Board-AS1
16 minutes
Voice Guidance Kit-G1
15 minutes
Voice Operation Kit-D1
12 minutes
NFC Kit-C1
19 minutes
Removable HDD Kit-AL1
11 minutes
HDD Mirroring Kit-J1
11 minutes
2.5 inch/250 GB HDD-N1
6 minutes
2.5 inch/1 TB HDD-P1
5 minutes
Image Data Analyzer Board-B1 for the Document Scan Lock Kit-B1
6 minutes
Connection Kit-A1 for Bluetooth LE
4 minutes
NFC Kit-C1
17 minutes
Copy Control Interface Kit-A1
5 minutes
8.2 Customer Installation Responsibilities
Item
Remarks
Identify location for equipment.
Area meets space and service space requirements.
Verify strength of floor and level.
Certified by structural engineers.
Ensure that the equipment can be
delivered to the site.
Path is clear and unobstructed.
Confirm proper electrical outlets and
power are available.
Dedicated power, and enough outlets for equipment
(including accessories).
Area meets environmental
specifications.
Temperature and humidity are within specifications,
venting provided if necessary.
Network connections available.
Required to activate ULM (standard) and other options.
Security systems and backup plan for
data and storage available.
Highly recommended.
TPM key backup plan.
Must have a TPM key backup plan when the TPM
setting is activated.
NOTE
For more information on backing up data, see “Backing Up/Exporting Data,” in
the
Before Using This Machine
e-Manual
.