2x
[2]
[1]
■ Handling after parts replacement
1. Clear the parts counter.
(LV1) COPIER > COUNTER > DRBL-2 > SDL-STC
Removing the Paddle Unit
■ Procedure
1. Lower the stack tray.
2. Lower the swing unit [1].
[1]
3. Turn the paddle axis until the paddle[2] reaches to
the guide[3].
[2]
[2]
[3]
[3]
[1]
NOTE:
Turn the paddle axis by 180 degree furthermore when the
claw[2] is still behind the paddle shaft.
[2]
[2]
4. Remove the paddle [1].
• 1 claw [2] each
CAUTION:
When displacing the shaft support[3], the phase of the
paddle probably does not fit. When installing the
paddle, be sure to check the phase of the paddle.
[3]
[3]
4. Parts Replacement and Cleaning
113
Summary of Contents for Booklet Finisher-AA1
Page 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Page 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Page 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Page 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Page 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Page 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Page 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Page 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Page 204: ...4 5 6 7 8 9 7 Installation 196 ...
Page 205: ...10 7 Installation 197 ...
Page 223: ...2 3 2x 7 Installation 215 ...
Page 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...