1-2
1-2
Check of main power OFF
Installation procedure
Check that the main power switch of the main body is OFF.
1) Turn OFF the main power switch of the main body.
2) Check that the indication lamps on the operation panel and the main power
lamp are out, and pull out the power plug.
1) Press
cassette
[1].
2) Press button [2]. Open cartridge door unit [3].
3) Open ADF unit and reader unit [1].
Schematic diagram of attachment