STUD

STUD

C.L. OF

HEATER

345 mm TO 610 mm

FLUE OPENING

GAS INLET

325 mm

246 mm

45 mm

30 mm

538 mm

FLUE
OPENING
DETAIL

METHOD A

600 mm MIN
BETWEEN TOP OF
COWL AND NEAREST
PART OF ROOF

75 mm MAIN
STUD WALL

ADJUSTMENT
STRAP

HEADER

TWIN
SKIN FLUE

TOP PLATE
FLUE SUPPORT

FLUE ADAPTER

FLASHING

FLUE CLAMP

FLUE COWL
APPROVED
TO AG604

ROOF CLADDING

100 mm DIA
FLUE PIPE

MAINTAIN 25 mm
CLEARANCE BETWEEN
FLUE AND WOODWORK

WALL CLADDING

12 mm FROM
BOTTOM OF
WALL CLADDING
TO TOP OF HEATER

MEASURE DISTANCE FROM
FLOOR TO TOP OF HEATER
FLUE OUTLET PLUS 2 mm

COWL

FIT
3 SCREWS

SMALL DIA
END WITH
SWAGE

TOP PLATE
FLUE SUPPORT

FLUE
ADAPTER

SINGLE
SKIN FLUE

Page 2.

Page 7.

FIG 6.

MOCK FIREPLACE ENCLOSURE RECOMMENDATIONS

FIG 1.

300mm MAX

2400mm MAX

550mm MAX

MAKE SURE THERE IS ADEQUATE VENTILATION IN ROOM.

The enclosure can be fabricated using any standard building
materials, providing that spacer brackets are fitted to the
heater to provide adequate clearances to combustible
materials. (see Fig 5).

The area of the cavity must not exceed our dimensions as
shown in the diagram. (see Fig 1).
If the enclosure is larger than our dimensions allow, a
separate boxed section around the heater will need to be
constructed.

The heater must sit on a solid, sealed base and the
enclosure must be sealed from any draughts and be
insulated as necessary to eliminate low temperatures.

An enclosure constructed to an existing room with a solid
floor and ceiling, and any other enclosure must have the
same characteristics of being sealed from any draughts and
suitably insulated from low temperatures. Failure to adhere to
this requirement will result in unreliable operation or failure to
operate correctly and is not covered by our warranty
conditions.