Assembly InstructIons for  

stAndArd And eP rAcks

9

 

Front Restraint Rail (EP only):

 With the batteries in 

place, slide the front side support rail and cover up from its 
resting location to its mounting location, aligning with rear 
side restraint rail. Install hardware and torque to 15-20 ft.-lbs. 
See Figure 8.

10

 

Final Assembly:

 Install corner brackets, end restraint rails, 

and covers. Position end restraint rail against end battery unit. 
See Detail 4. Note that the corner bracket may be reversed 
by 180° if required. Install all front cross braces if indicated by 
rack assembly drawing. Torque to 55-65 ft.-lbs. See Figure 9 
for final rack assembly.

11

 

Battery Arrangement:

 Install inter-cell and inter- 

unit connectors and cable assemblies as specified by 
battery arrangement. Refer to Battery Installation Manual  
(RS-1476) for more detail on battery connection and 
initialization change.

Figure 9. Assembled EP Rack,  

With Front Cross Braces

Detail 4. End Restraint Rail(s) 

 and Corner Brackets

3/8-16 Hex Bolt, Lock 

Washer and Serrated Nut

Side Restraint  

Rail and Cover

End Restraint 

Rail and Cover

Corner 

Bracket

Figure 8. Installed Front Restraint Rail

Restraint Rails and  

Cover (Installed)