
11
The screen will be locked after 3 minutes. To unlock the screen press and hold the MENU
key for 3 seconds.
MANUAL REGENERATION
Press and hold the SET REGEN button for 3 seconds to enter the manual regeneration page.
The screen will display:
1. If you choose DELAY, the valve will start a regeneration at the next regeneration time
(default is 2:00 AM).
2. If you choose IMMEDIATE, the valve will start a regeneration immediately.
When a regeneration is started, the screen will display:
Summary of Contents for 95 Series
Page 8: ...8 Softener Installation...