pg. 5
• obtain fan motor
• remove cotter pin and bolt from yoke
• loosen jam screw in yoke until it is flush with the inside surface
• obtain dowrod and canopy (and yoke cover - optional)
• place downrod inside canopy (and yoke cover - optional)
• route wires and safety cable exiting motor through canopy and downrod
• insert bolt through hole in shaft and downrod
*be careful not to damage or cut the fan wires
• secure bolt with cotter pin
• secure downrod in position by tightening jam screws and lock nut
• place glass motor housing onto motor top
• slide yoke cover (optional) over yoke
1. MOUNTING
*NOTE: all set screws must be checked and re-tightened where
necessary after installation.
INSTALLATION
A. DOWNROD MOUNT
jam screw
lock nut
motor
yoke cover
(optional)
jam screw
yoke
cotter pin
bolt
yoke
jam
screw
pg. 6
INSTALLATION
• remove rubber ring from canopy.
• place canopy on fan housing by aligning 3 larger holes of canopy over
3 existingscrews on the motor housing.
• secure canopy to motor housing by placing 3 screws and washers
(supplied in hardware package) in the 3 smaller holes in the canopy.
1. MOUNTING (CONTINUED)
B. FLUSH MOUNT
• secure rubber gasket and mounting bracket to metal outlet box using outlet box screws
• secure once more by placing two wood screws and flat washers (supplied) through
outer slots of mounting bracket and into the wood joist. Leave one of the wood screws
sufficiently loose to allow the safety cable to be looped around before final tightening.
2. INSTALL MOUNTING BRACKET
wood screws &
flat washers
outlet box
screws
mounting
bracket
rubber gasket
metal outlet box
wood joist
ceiling
canopy
rubber ring