background image

1

2

CAN

NAR

TOLE

R

A

N

WH

E

R

F

R

ACT

I

O

D

EC

I

MAL

A

NGU

LA

RM

3

4

6

5

7

PIÈCES DE REMPLACEMENT
SÉRIE IDL / VUE ÉCLATÉE
(IDL07, IDL09 & IDL10)

ILLUSTRATION 8

NUMÉR

O

D

ES

C

RIPTI

O

N

1

C

ab

i

net

2

S

upport

 

de

 

montage

3

S

ouff

l

eur

4

Panneau

 I

nf

é

r

i

eur

5

R

a

il 

du

 

moteur

6

L

o

q

uet

 

de

 

s

é

cur

i

t

é

7

P

l

a

q

ue

 

du

 

moteur

LISTE 

D

E PIÈ

C

ES

1.

Compléter les connexions électriques, et remettre la tension temporairement le temps de vérifier la rotation adéquate de la roue 
(voir 

Illustration 1

).

2.

Mettre sous tension.

3.

Avec tous les conduits fixés, les portières d’accès en place le système d’air en pleine opération, mesurer le courant émis par le
moteur et assurez-vous qu’il est moindre que l’ampérage indiqué sur la nomenclature.

SÉRIE IDL

SOUFFLEURS  DE CONDUIT EN LIGNE

IDL-M-07_20_16

Page 4 de 5

AVERTISSEMENT

ASSUREZ-VOUS QUE L’APPAREIL EST HORS TENISON ET VÉRROUILLÉ AVANT DE PROCÉDER AUX CONNEXIONS
ÉLECTRIQUES.

OPÉRATION 

1.

Vérifier et serrer  après 50 à 100 heures d’opération  toutes les vis d’arrêt sur la collerette de roulement et de la roue.  Une vérification
périodique doit être faite  régulièrement après.

2.

Suivre les instructions du fabriquant pour la lubrification du moteur.  Enlever tout excès de lubrifiant.

3.

Vérifier les entraînements.

a.

Serre les vis d’arrêt des poulies, des roues et des collerettes du roulement.

b.

Vérifier la tension de la courroie et son alignement.

c.

Remplacer les courroies fissurées ou usées.

4.

Les roulements du souffleur sont lubrifiés à vie et n’exigent  aucun lubrifiant.

5.

Vérifier les courroies en V pour toute usure ou mauvaise tension.  Si un remplacement d’une courroie est nécessaire sur un 
entraînement  à courroies multiples, remplacer les toutes  pour  assurer qu’elles sont identiques.  Ne pas utiliser un réparateur de 
courroie.

6.

Nettoyer la roue du souffleur périodiquement.  Une accumulation de débris sur les pales peut causer un débalancement dans la roue
ou une défaillance du roulement.

7.

Pour installer  les roulements à billes de remplacement,  appuyer la collerette d’arrêt contre l’anneau intérieur du roulement et tourner
en direction de l’arbre jusqu’à ce que engagement complet.  Insérer  une goupille dans le trou et taper légèrement pour engager.  
Serrer la vis d’arrêt fermement sur la collerette  (voir 

Illustration 7

).

8.

Si un entretien additionnel au souffleur est nécessaire, consulter la vue éclatée (

Illustration 8 ou 9

).

ENTRETIEN

Summary of Contents for IDL series

Page 1: ...ate the blower wheel by hand to ensure free rotation If rubbing occurs loosen the set screw s re position the wheel to the shaft center re tighten set screws INSTALLATION Install the mounting brackets to the holes on the blower sides to achieve an ideal mounting position Use the 5 16 hole plug in 7010053 parts bag to block the holes not needed Suspend the unit by threaded rod provided by others th...

Page 2: ...L SAFETY LATCH FIGURE 2 FIGURE 3 IDL SERIES INLINE DUCT BLOWERS IDL M 07_20_16 Page 2 of 5 INSTALLATION Continued ACCESSING MOTOR DRIVES Caution Clear remove the objects below the blower before installation maintenance Keep clear of the area directly below the blower When swinging down the hinge base to access the motor drives always support the bottom of the unit and gradually release the base to...

Page 3: ...n place using the 2 bolts on both sides of the blower Ideal belt tension is the lowest tension at which the belt will not slip during start up As shown in illustration to right a proper deflection of 1 64 of the belt span is desired for belt tension ELECTRICAL WARNING EXCESSIVE BELT TENSION IS THE MOST FREQUENT CAUSE OF BEARING WEAR AND RESULTING NOISE PROPER BELT TENSION IS CRITICAL FOR QUIET EFF...

Page 4: ...n and periodically thereafter 2 Follow motor manufacturer s instructions for motor lubrication Remove any excess lubrication 3 Check the drives a Tighten set screws on pulleys wheel and bearing locking collars b Check belt tension and alignment c Replace cracked or worn belts 4 Blower bearings are permanently lubricated and require no further lubrication 5 Inspect V belts for wear and proper tensi...

Page 5: ...ve parts Labour and transportation costs are not included Canarm Ltd Corporate Head Office 2157 Parkedale Avenue PO Box 367 Brockville Ontario Canada K6V 5V6 Tel 613 342 5424 Fax 613 342 8437 hvacsales canarm ca www canarm com 9 1 3 8 0 1 2 0 1 6 7 4 2 5 IDL SERIES REPLACEMENT PARTS EXPLODED VIEW IDL12 IDL15 FIGURE 9 NUMBER DESCRIPTION 1 Top Panel 2 Side Panel 3 Back Panel 4 Front Panel 5 Bottom Pa...

Page 6: ... souffleur à la main afin d assurer qu elle tourne librement S il y a un frottement dévisser la les vis et repositionner la roue de nouveau sur l arbre Resserrer les vis INSTALLATION Poser les supports de montage dans les trous situés sur les côtés du souffleur afin d obtenir la position idéale d installation Utiliser les bouchons de 5 16 dans le sac de quincaillerie 7010053 pour boucher les trous...

Page 7: ...u jusqu à ce que le loquet de sécurité prévienne le panneau de basculer plus bas ÉTAPE 2 ILLUSTRATION 3 4 OU 5 Soutenir le panneau inférieur tirer le loquet de sécurité loin de l unité pour libérer le boulon Basculer et descendre le panneau inférieur jusqu à ce qu il soit stabilisé Après l installation l entretien basculer le panneau du bas vers le haut et enclencher le verrou de sécurité au boulo...

Page 8: ...incaillerie inclus 4 Avec la plateforme dans sa position minimum poser la courroie en V sur les entailles de la poulie Positionner le moteur sur sa plateforme tout en vous assurant de l alignement de la poulie voir Illust 6 et fixer à la plateforme du moteur Le rebord droit sur la face de la poulie en mouvement doit être parallèle à la courroie une fois le bon alignement a été atteint N B Les ajus...

Page 9: ...ès 2 Suivre les instructions du fabriquant pour la lubrification du moteur Enlever tout excès de lubrifiant 3 Vérifier les entraînements a Serre les vis d arrêt des poulies des roues et des collerettes du roulement b Vérifier la tension de la courroie et son alignement c Remplacer les courroies fissurées ou usées 4 Les roulements du souffleur sont lubrifiés à vie et n exigent aucun lubrifiant 5 Vé...

Page 10: ...éfectueuses Le coût de transport et de main d œuvre ne sont pas inclus Canarm Ltée 2157 Parkedale Avenue PO Box 367 Brockville Ontario Canada K6V 5V6 Tel 613 342 5424 Fax 613 342 8437 hvacsales canarm ca www canarm com 9 1 3 8 0 1 2 0 1 6 7 4 2 5 PIÈCES DE REMPLACEMENT SÉRIE IDL VUE ÉCLATÉE IDL12 IDL15 ILLUSTRATION 9 NUMÉRO DESCRIPTION 1 Panneau Supérieur 2 Panneau de Côté 3 Panneau Arrière 4 Pann...

Reviews: