PROJECT NAME
LOCATION
NUMBER
INSTALLATION AND
COMMISSIONING CHECKLIST
Warning: This checklist is not a replacement for the user manual.
Please read the user manual prior to inverter site selection and installation.
3 PHASE STRING INVERTERS
(KTL SERIES)
C
S
IF
-S
T-
0
1
6 A
/0
Step
No.
Content
Details
Values / Notes
Conclusion
3
Waiting time
CSI-xx-KTL-CT: A standard 5 minute delay is required
before the inverter generates any power to the grid.
In normal operation mode, the “Power”, “Run”, and
“Grid” LEDs are solid green and the“Fault” LED is off.
[ ] Completed
Record LEDs status in Notes
CSI-xx-KTL-GS: After 30-180 seconds (depending on local
requirement), the inverter will start to generate power.
The green LED will be on continuously and the LCD
displays the information of GENERATING.
[ ] Completed
Record LEDs status in Notes
4
Power generation
After grid connection, record power output of inverter.
[ ] Completed
Record power in Notes
5
Date & Time
setting
Set the current date and time using the front
panel interface.
[ ] Completed
Record current date/time
in Notes
6
Communication
setting (if avail.)
Set communication with a unique address for
each inverter.
[ ] Completed
Record address in Notes
7
Machine version
For maintenance and reference, please record the
irmware revisions if applicable.
[ ] Completed
Record with serial numbers
8
Operating
parameter
Record operating parameters of the inverter.
Verify IEEE1547 or UL1741 setting is selected.
De-rate inverter and attach de-rate sticker as required.
[ ] Completed
Record operating
parameters in Notes
9
Testing
Open and close the DC breaker to conirm whether the
inverter reboots and shuts down automatically.
[ ] Reboot successful
[ ] Not rebooting
10
Completion
Installation and commissioning is complete if
no abnormality.
[ ] Good
[ ] Issues detected