background image

Model 109SS Temperature Probe 

The resistance of the thermistor is: 

=

1

900

,

24

V

V

R

EX

t

 

The Steinhart and Hart equation is used to calculate temperature from 
Resistance: 

3

))

(ln(

)

ln(

1

T

T

K

R

C

R

B

A

T

+

+

=

 

Where T

K

 is the temperature in Kelvin.  The Steinhart and Hart coefficients 

used in the Therm109 instruction are: 

A = 1.129241x10

-3

 

B = 2.341077x10

-4

 

C = 8.775468x10

-8 

7.  Maintenance and Calibration 

The 109SS Probe requires minimal maintenance.  Periodically check cabling 
for proper connections, signs of damage, and possible moisture intrusion.  For 
all factory repairs and recalibrations, customers must get a returned materials 
authorization (RMA).  Customers must also properly fill out a “Declaration of 
Hazardous Material and Decontamination” form, and comply with the 
requirements specified in it.  Refer to the “Warranty and Assistance” page for 
more information. 

8.  Troubleshooting 

Symptom:  Temperature is NAN, -INF, -9999, -273 

Verify the red wire is connected to the correct Single-Ended analog input 
channel as specified by the measurement instruction, the black wire is 
connected to the switched excitation channel as specified by the measurement 
instruction, and the purple wire is connected to datalogger ground.  

Symptom:  Incorrect Temperature 

Verify the multiplier and offset parameters are correct for the desired units 
(Section 5).  Check the cable for signs of damage and possible moisture 
intrusion. 

For all factory repairs, customers must get an RMA.  Customers 
must also properly fill out a “Declaration of Hazardous Material 
and Decontamination” form and comply with the requirements 
specified in it.  Refer to the “Warranty and Assistance” page for 
more information. 

NOTE 

11 

Summary of Contents for TEMPERATURE PROBE 109SS

Page 1: ...Model 109SS Temperature Probe Revision 12 10 C o p y r i g h t 1 9 8 3 2 0 1 0 C a m p b e l l S c i e n t i f i c I n c...

Page 2: ...International customers residing in countries served by Campbell Scientific Inc directly Affiliate companies handle repairs for customers within their territories Please visit www campbellsci com to...

Page 3: ...am for CR200 X Series Datalogger 6 5 1 1 2 Example 2 Sample Program for CR1000 Datalogger 6 5 1 1 3 Sample Program for CR5000 7 5 2 Edlog 7 5 2 1 Example Edlog Program 7 5 3 Electrical Noisy Environme...

Page 4: ......

Page 5: ...fast time response This probe measures temperature from 40 to 70 C The thermistor can survive temperatures up to 100 C but the overmolded joint and cable should not be exposed to temperatures greater...

Page 6: ...nformation Thermistor BetaTherm Micro BetaCHIP Probe 10K3MCD1 0 018 diameter 10Kohms at 25 C Probe stainless steel sheath 0 063 inch 0 16 cm diameter 2 3 inch 5 84 cm length overmolded joint 0 40 inch...

Page 7: ...6 C over the range of 40 to 70 C and 0 49 C over the range of 20 C to 70 C The major error component is the interchangeability specification tolerance of the thermistor The bridge resistor has a 0 1 t...

Page 8: ...d with one single ended input channel and a Voltage Excitation channel Multiple probes can be connected to the same excitation channel the number of probes per excitation channel is physically limited...

Page 9: ...rm109 is used to measure temperature Therm109 provides excitation makes a single ended voltage measurement and calculates temperature The Therm109 instruction has the following form Therm109 Dest Repe...

Page 10: ...0 EndTable BeginProg Scan 1 sec Measure the temperature Therm109 Air_Temp 1 1 Ex1 1 0 0 Call the data table CallTable AvgTemp NextScan EndProg 5 1 1 2 Example 2 Sample Program for CR1000 Datalogger C...

Page 11: ...the resistance lnRt Log Rtherm Apply the Steinhart and Hart equation and convert to degrees C in one step Air_Temp 1 1 129241e 3 2 341077e 4 lnRt 8 775468e 8 lnRt 3 273 15 Call the data table CallTab...

Page 12: ...c V_Vx 7 1 0 Mult 8 0 0 Offset 2 Z 1 X P42 1 1 X Loc V_Vx 2 2 Z Loc Vx_V 3 Z X F P34 1 2 X Loc Vx_V 2 1 F 3 3 Z Loc Vx_V_1 4 Z X F P37 1 3 X Loc Vx_V_1 2 24900 F 3 4 Z Loc Rtherm 5 Z LN X P40 1 4 X Lo...

Page 13: ...integration options are not available for the CR200 X 5 4 Long Lead Lengths Additional settling time may be required for lead lengths longer than 300 feet where settling time is the delay before the m...

Page 14: ...sary for general operation of the 109SS Probe with CSI s dataloggers The Therm109 Instruction outputs a 2500 mV excitation and measures the voltage across the 24 9 K resistor Figure 6 1 The thermistor...

Page 15: ...on form and comply with the requirements specified in it Refer to the Warranty and Assistance page for more information 8 Troubleshooting Symptom Temperature is NAN INF 9999 273 Verify the red wire is...

Page 16: ...stable Temperature Try using the 60 Hz or 50 Hz integration options and or increasing the settling time as described in Sections 8 and 9 Make sure the clear shield wire is connected to datalogger grou...

Page 17: ......

Page 18: ...p CSC 11564 149th Street NW Edmonton Alberta T5M 1W7 CANADA www campbellsci ca dataloggers campbellsci ca Campbell Scientific Centro Caribe S A CSCC 300 N Cementerio Edificio Breller Santo Domingo Her...

Reviews: