background image

 

Campbell Company 

  

Guardian Installation Manual

 

906-0056  Guardian Installation Manual Rev A.docx 

© Dick Campbell Company 2020. All rights reserved 

Page 10 of 11 

Post Installation 

4.1 

Operational Check 

1.  Make sure the station is securely attached to the pole with the arrow pointing to the 

crosswalk. 

2.  Verify that the SPI is mounted horizontally in the signal head with the wiring sagging 

below. 

3.  When first powered up, an audible locator tone will be present at the station. The locator 

tone should be audible 6-12 feet from the station.  

4.  Depress the push button and verify that the LED turns on with an acknowledgement 

message. If pedestrian field wires are connected to the station, verify that pedestrian call 

is transmitted to the traffic controller. 

5.  Following a momentary press, verify the Walk message present and the vibro-tactile 

surface vibrates when the walk sign is on. 

6.  Repeat again with an extended press. This time the location message should sound and 

walk message should sound when the walk sign is on. 

7.  After the Walk message, verify that an audible locator tone is present during the clearance 

(Flashing Don’t Walk). 

8.  Recheck all units for a full cycle to ensure all options and features operate as desired.   

Summary of Contents for Guardian

Page 1: ...Guardian Pedestrian Signal Installation Manual 906 0056 Revision A January 29 2020 ...

Page 2: ...nic mechanical photocopying recording or otherwise without prior written permission from Campbell Company All copyright confidential information patents design rights and all other intellectual property rights of whatsoever nature contained herein are and shall remain the sole and exclusive property of Campbell Company The information furnished herein is believed to be accurate and reliable Howeve...

Page 3: ... Guardian Installation Manual Rev A docx Dick Campbell Company 2020 All rights reserved Page 3 of 11 Guardian Installation Manual 906 0056 Document Revision History Revision Revised By Date A James Elfering Added 5 0 Features 1 29 20 Guardian Guardian 400A ...

Page 4: ...hts reserved Page 4 of 11 1 Table of Contents 1 Table of Contents 4 2 Introduction 5 2 1 PURPOSE OF THIS DOCUMENT 5 2 2 ADDITIONAL INFORMATION 5 2 3 CONTACT INFORMATION 5 3 Installation 6 3 1 STANDARD COMPONENTS 6 3 2 INSTALLATION 6 4 Post Installation 10 4 1 OPERATIONAL CHECK 10 5 Appendix A Acronyms Abbreviations Definitions 11 ...

Page 5: ... see the User s Manual 2 2 Additional Information For operational information see the Guardian User s Manual Reference the Intersection Worksheet for location specific information See the Guardian Installation Quick Guide for a brief graphical installation guide See the Guardian Base Station Mounting Template for an easy to use hole pattern for mounting Guardian base stations 2 3 Contact Informati...

Page 6: ...PI 1ea USB type B cable per installation 3 2 Installation It is recommended to use an anti seize compound on all screws going into the pedestrian station Failure to do so may result in damage to the station if removal is necessary 3 2 1 Tactile Arrow Orientation Mount the unit so the tactile arrow is pointing directly to the crossing destination THE PEDESTRIAN RELIES ON THIE INFORMATION TO CROSS S...

Page 7: ...ount the Pedestrian Station 1 Route the four conductor cable from the 1 hole through the pole into the pedestrian signal head for connection to the SPI 2 Route the four conductor cable and the field terminal wires through the wire chase at the bottom of the station 3 Attach the pedestrian station to the pole using two 20 FHP screws 4 Connect the four wires to the terminal block connections as show...

Page 8: ...he pushbutton into the 400 style housing and secure using two 1 4 20 screws Figure 2 3 2 4 Signal Power Interface Installation Do not set the SPI on the bottom of the Pedestrian Signal Head Failure to attach the SPI vertically on the back surface wall can expose the power supply to water damage and will void the warranty of the SPI Warning All SPI leads become hot when at least one of the wires is...

Page 9: ...n the wires into the SPI Figure 2 shows the drip loop in the120 VAC lines and its location to the barrier terminal inside the Pedestrian Signal Head 4 Attach the four wires from the Base Station to the to the four position terminal block on the SPI following the connections shown in Figure 3 5 Connect the three 16 AWG wires from the SPI to the three position terminal block for the pedestrian signa...

Page 10: ... 12 feet from the station 4 Depress the push button and verify that the LED turns on with an acknowledgement message If pedestrian field wires are connected to the station verify that pedestrian call is transmitted to the traffic controller 5 Following a momentary press verify the Walk message present and the vibro tactile surface vibrates when the walk sign is on 6 Repeat again with an extended p...

Page 11: ...S station that contains the microcontroller push button speaker adapter plate Extended Press On APS holding the pedestrian push button down may activate special features including audible beaconing and extended pedestrian clearance interval Intersection Worksheet Intersection Map of street names and station locations provided with installation packet Signal Power Interface SPI Power Source that in...

Reviews: