background image

FT-214 Portwenn Fountain 

Assembly Instructions

Assemble your fountain on a level surface capable of holding a minimum of 325 lbs with an  
approximate 1 sq. ft. footprint (actual dimensions 14" x 14").

Step 1 -   Position the basin (FT-214B) where the fountain is to be installed, ensuring that it is level.

Step 2 -   Assemble the pump kit:

 

2a - Using a hose clamp, attached the 1/2" non-kink tubing to the pump outlet.

 

2b - Place the stopper around the pump cord approximately 6" from the pump.

Step 3 -   Feed the pump cord through the hole in the basin (FT-214B) and out of the channel.

Step 4 -   FIRMLY press the stopper into the hole evenly.

 

4a -  Note: Using the handle of a screwdriver or hammer works best to press the stopper in 

place.

Step 5 -   Coil the pump cord in the pump house and push the pump down as far into the pump 

house as possible.

FT-214B (268 lbs) 

26.5"L x 26.5"W x 36.75"H

Fountain Set-Up:

 

Assembly & Installation - A fountain can be difficult to install without knowing and understanding the steps involved. To ensure your fountain is  
installed properly, please read our instructions and tips before you begin.
 

Step 1 -   Seek Professional Help: Check if professional installation is recommended for your fountain.

 

Step 2 -   Check Foundation: Place your fountain on a level surface. It is recommended to place your fountain on concrete or a hard packed  

gravel pad. If the base is level but some components seem off, rotate components or use wedges to level them.

 

Step 3 -   Create a Drip Loop: To prevent water from dripping down the cord and damaging the electrical socket, create a drip loop by allowing  

the pump power cord to fall below the wall outlet.

 

Step 4 -   Use a GFCI Outlet: Use only a GFCI outlet when running a fountain.

Step 6 -   Holding the water feature (FT-214A) over the basin (FT-214B), insert the 1/2" CPVC  

portion of the tubinf assembly into the coupling protruding from the bottom.

Step 7 -  Place the water feature (FT-214A) onto the basin (FT-214B) ensuring that it is level.

 

7a - Turn the feature and coil the tubing as you lower it into position.

Step 8 -  Fill the fountain with water.

FT-214A (22 lbs) 

13.75"L x 13.75"W x 5.75"H

Reviews: