FT-162 M-Series Escala Fountain
Assembly Instructions
FT-190B (4 lbs)
6"L X 6"W x 3.5"H
Step 7 - Place the pump house (FT-190B) over the pump and centered inside of the basin
(FT-162C).
Step 8 - Holding the water feature (FT-162A) over the pump house (FT-190B), insert the CPVC end
of the tubing into the coupling protruding from the bottom.
Step 9 - Center the water feature (FT-162A) onto pump house (FT-190B).
Step 10 - Connect the pump cord to the transformer.
FT-162A (6 lbs)
8.25"L X 8.25"W x 1.75"H