FT-190 M-Series Artifact Fountain
Assembly Instructions
Step 6 - Fill the basin enough to cover the pump completely with water to check for leaking.
6a - If leaking occurs…
- Remove the stopper and repeat step 5 again.
- Use some of the excess putty to seal the cord around the top of the stopper.
See image “D”.
- Let the fountain dry completely, then use 100% clear silicone to seal around the
pump cord and perimeter of the stopper. Silicone must set for 24 hours before
adding water.
D
Step 7 - Place the pump house (FT-190B) over the pump and centered inside of the basin
(FT-190C).
Step 8 - Holding the water feature (FT-190A) over the basin (FT-190B), insert the CPVC end of the
tubing into the coupling protruding from the bottom.
Step 9 - Center the water feature (FT-190A) into basin (FT-190B).
Step 10 - Connect the pump cord to the transformer.
FT-190B (4 lbs)
6"L x 6"W x 3.5"H
FT-190A (8 lbs)
12"L x 12"W x 1.5"H