 Japanese Myojin Style Torii Gate 

Assembly Instructions & Installation Guide 

T e mp o -
r a r y 
w o o d  
Board 

Bottom KASAGI 

(3) 

Four KUSABI (6) 

NUKI 

(2) 

Top KASAGI 

(5) 

Two  

GAKUZUKA (4) 

Two  Cement 
Frames (7) 

Thank you for purchasing a  Japanese Myojin Style Torii Gate from SamsGazebos.  Assembling it  may take 45 minutes and an 
hour to set with cement.  Minimum two persons  are recommended to assemble this item for your safety.  Please work on a 
clean level floor for the best result.  Remove the wrapping material, prepare the tools and material, and lay out the parts before 
assembly in order to save you time and effort.  Each kit is custom built with pilot holes for your convenience.  Wash hands after 
handling.  Handle with care; poles are round and heavy. 

Tools / things you need: 

◇ 

Cordless Screw Driver or Philips Screw ) 

◇ 

Socket Wrench 

◇ 

2 Hammers 

◇ 

Level 

◇ 

Ladder 

◇ 

Square 

◇ 

Knife 

◇ 

Pencil / Pen 

◇ 

Measure Tape 

◇ 

Shovel  

◇ 

Minimum 4 bags of ready mix cement (Get extra bags of cement  for  large holes.) 

◇ 

Wheelbarrow or container to mix cement 

◇ 

Water 

◇ 

Nitrile Gloves (included) 

◇ 

2 Strings (included) 

◇ 

Hardware (two 1/2” x 8”lag bolts with washers, 4 large screws (2-1/2”), 22 small screws (1-5/8”)(included) 

1  HASHIRA 

Made in the USA 

Summary of Contents for Japanese Myojin Style Torii Gate

Page 1: ...aterial prepare the tools and material and lay out the parts before assembly in order to save you time and effort Each kit is custom built with pilot holes for your convenience Wash hands after handli...

Page 2: ...side and IN for the other 4 Place two poles outside out 5 Insert a NUKI through pole holes Do it one pole HASHIRA at a time 6 Put a bottom KASAGI Match the alphabet number IN OUT Square IMPORTANT Chec...

Page 3: ...vely you can also do the step 7 with the Torii on the ground B o t t o m KASAGI Alternatively you can fasten the GAKUZUKA after step 20 11 Fasten a temporary wood board with large screws where marked...

Page 4: ...ont or back Adjust the pole positions if not level 20 Untie the strings to pull down the cement frames put them at the bottom and finish the cement work Remove the extra wood board at the bottom when...

Page 5: ...lled the Safe Drinking Water and Toxic Enforcement Act is a Right to know law regarding Californians being able to make informed decisions to protect themselves from chemicals known to cause cancer bi...

Page 6: ...pper Green R BROWN wood preservative is available at your local Home Depot R if you prefer a rustic look Finishing with a deck stain is highly recommended it is a matt finish but will look same for 10...

Page 7: ...e Myojin Style Torii Gate Parts List info samsgazebos com 1 800 376 7267 1 Top Kasagi 1 Bottom Kasagi 1 Nuki 2 Gakuzuka 4 Kusabi 2 Cement Frames 2 Strings 2 Hashira 1 Temporary wood board 2 Small wood...

Reviews: