EMC_SPEC040_CLCR.doc
Rev. E
–
2021 10 18
32/63
Install & Operating Manual
CleanSeal V3
9.4
Mobile Integrity Probe (MIP)
The Mobile Integrity Probe (MIP) is a manual scanning system for exhaust air applications,
integrated downstream into the housing and suitable for wall and ceiling installations.
PLEASE NOTE:
Read the full instruction prior to installation.
Follow steps below, further detail is given in indicated sub-chapters.
Installation Steps
•
Install the housing using special precaution,
see § 8
•
Carefully choose the location of the Control Box before cutting the panel,
see § 9.4.2
•
Adapt the Control Box locking system to the panel thickness,
see § 9.4.3
•
Cut out the panel for housing and Control Box,
see § 8.2
Cutout sizes, installation and related options for the respective housing are unaffected by the MIP
device, but integration depth is increased.
Consult Scope Drawings or your Project Drawing for exact dimensions.
•
Attach the MIP drive shaft
and the Sampling tube
to the housing drive port,
see § 9.4.4
•
Install port fittings and attach pressure tubes to the housing ports
see § 8.6
•
Install the housing (composed of
) in the wall and attach the air duct,
see § 8.4
•
Attach the MIP drive shaft
, the Sampling tube to the Control Box and the housing
see § 9.4.4
and connect pressure tubes to the manometer.
We recommend checking smooth MIP operation over the full displacement before installing
and sealing the Control Box,
see § 9.4.6
•
Install Control Box,
see § 9.4.5
•
Seal installation as required at customer’s / contractor’s discretion.
Base housing
–
Open Plenum version
MIP section (modular)
Plenum section (modular)
Control Box for MIP-drive and sampling port
MIP flexible drive shaft
Sampling tube
Manometer up- & downstream pressure tubes
Quick Clamping Kit (option)
Base housing
–
Open Plenum version
MIP section (modular)
Plenum section (modular)
Control Box for MIP-drive and sampling port
MIP flexible drive shaft
Sampling tube
Manometer up- & downstream pressure tubes
Quick Clamping Kit (option)