5 Installation
240
240
320320
145
145
#!-%
#!-%
240
240
320320
165
165
#!-%
#!-%
!02%
#()5$%
A
ll t
h
e d
at
a a
n
d i
n
fo
rm
at
io
n c
o
n
ta
in
ed h
er
ei
n i
s c
o
n
si
d
er
ed s
u
b
je
ct to c
h
an
g
e a
t a
n
y t
im
e a
n
d a
t o
u
r d
is
cr
et
io
n
.
4
ENGLISH
Before proceeding with the installation, it is necessary to:
•
Check that the control panel is installed in an area protected from bumps and that the anchorage surface is solid, and that it
is secured with suitable elements (screws, inserts, etc).
•
Provide for suitable omnipolar disconnection device with more than 3 mm between contacts to section power supply.
•
Connections inside the case made for protection circuit continuity are allowed as long as they include additional insulation
with respect to other internal drive parts.
•
Install suitable tubes and ducts for electric cable passage to guarantee protection against mechanical damage.
5 .1 Preliminary checks
5.2 Equipment and materials
Make sure all the necessary tools and materials are available to carry out the installation with the maximum safety, in com-
pliance with regulations in force. Here are some examples.
5.3 Dimensions, axle bases and fastening holes
Max. 6 mm Phillips round head screws are recommended.
Dimensions of ZT5 case
Dimensions of ZT5 C case