CAME ZA3N Installation Manual Download Page 6

p. 

6

 - M

an

u

al

 

FA

0

1

07

8

-E

N

 - 0

2

/2

0

18 © C

A

M

E S

.p.

A

. - T

ra

n

sl

ati

on of th

e o

rig

in

al

 in

str

u

cti

on

s

INSTALLATION

Fastening the control panel

 Fasten the control panel in a protected area; 

use rounded cross head screws with maximum 
6 mm diameter. maximum 6 mm diameter.

 Perforate the punched holes.

 The holes have different diameters: 23, 29 

and 37 mm.

 Be careful not to damage the control board 

inside the casing.

 Enter the cable gland with the corrugated 

tubes for threading the electrical cables.

Cable type and minimum section

Connection

cable length

< 20 m

20 < 30 m

Control panel power-supply

3G x 1.5 mm

2

3G x 2.5 mm

2

Motor power supply

4G x 1.5 mm

2

4G x 2.5 mm

2

Signaling devices

2 x 0.5 mm2

Command and control devices

2 x 0.5 mm2

Safety devices (photocells)

2 x 0.5 mm2

 

 When powered at 230V and used outdoors, use H05RN-F-type cables that conform to 60245 IEC 57 

(IEC); whereas indoors, use H05VV-F-type cables that conform to 60227 IEC 48V, 53 (IEC). When powered up to you 
may use FROR 20-22 II-type cables that conform to standard EN 50267-2-1 (CEI).
For the Encoder use 2402C 22AWG-type cables up to 30 m.
Fora CRP connection use UTP CAT5-type cables up to 1,000 m.
Use RG58cable up to 10 m long to connect the antenna.

 

 If cable lengths differ from those specified in the table, establish the cable sections depending on the actual power 

draw of the connected devices and according to the provisions of regulation CEI EN 60204-1.

 

For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated according 

to the actual power draw and distances. For connecting products that are not contemplated in this manual, see the 
literature accompanying said products

Tools and materials

Make sure you have all the tools and materials you will need 
for installing in total safety and in compliance with applicable 
regulations. The figure shows some of the equipment installers 
will need.

Summary of Contents for ZA3N

Page 1: ...Control panel for 230Vgearmotors ZA3N INSTALLATION MANUAL EN English FA01078 EN...

Page 2: ...te any guided part that includes a pedestrian gate unless the latter can be activated only when the pedestrian gate is secured Make sure the anchoring spot is clear of any potential impacts that the a...

Page 3: ...Make sure you have set up a suitable dual pole cut off device along the power supply that is compliant with the installation rules It should completely cut off the power supply according to category...

Page 4: ...table The card providesand controls the following functions automatic closing following an opening command pre flashingby the movement indicator light obstructiondetection when gate is not moving at...

Page 5: ...ted internally Colour of thetransformer and condenser cables white red black orange purple light blue Description of parts 1 Connection terminals 2 Control board fuses 3 Fuse for control devices and a...

Page 6: ...57 IEC whereas indoors use H05VV F type cables that conform to 60227 IEC 48V 53 IEC When powered up to you may use FROR 20 22 II type cables that conform to standard EN 50267 2 1 CEI For the Encoder u...

Page 7: ...otor with delayed opening Electolock connection 12V 15W max Terminals for powering the 24VA C accessories Control panel 230V A C 50 60 Hz ELECTRICAL CONNECTIONS AND PROGRAMMING Input voltage Gearmotor...

Page 8: ...n made on the DIP switches see selecting functions DIP switches 2 and 3 Key switch selector and or opening button N O contact For commanding the gate to open Stop button N C contact For commandingthe...

Page 9: ...to ON Safety devices with DIP switch 8 OFF DIP switch 10 OFF with DIP switch 8 OFF DIP switch 10 ON Connection for reclosing during opening N C contact With safety devices such as photocells sensitive...

Page 10: ...osingcommand thegateleavesjoltinwards forasecond tohelpreleasetheelectriclockconnectedtoterminals11 S This is active only if the leaves are closed and at the end of the operating time or at the rst ma...

Page 11: ...ontrol board AFTER CUTTING OFF THE MAINS POWER SUPPLY N B The control board recognizes the radiofrequency card only when it is powered up Saving CH1 Channel for direct commands to a feature of the gea...

Page 12: ...SPOSAL Always make sure you comply with local laws before dismantling and disposing of the product The packaging materials cardboard plastic and so on should be disposed of as solid household waste an...

Reviews: