8
10
1
15
16
13
5
4
4
5
7
6
1
9
11
12
3
17
7
6
2
14
p.
7
- M
an
ua
l
FA
010
84
-E
N
- 0
2/
20
18 - © C
AM
E S
.p
.A
. - "
Tr
an
sl
at
ed o
rig
in
al i
ns
tru
ct
io
ns
"
GENERAL INSTALLATION INDICATIONS
⚠
Only skilled, qualified staff must install this product.
PRELIMINARY CHECKS
⚠
Before beginning the installation, do the following:
•
check that the upper slide-guides are friction-free;
•
make sure there is are opening and closing mechanical gate stops;
•
make sure that the point where the gearmotor is fastened is protected from any impacts and that the surface
is solid enough;
•
set up suitable tubes and conduits for the electric cables to pass through, making sure they are protected from
any mechanical damage.
TOOLS AND MATERIALS
Make sure you have all the tools and materials you will need for installing in total safety and in compliance with
applicable regulations. The figure shows some of the equipment installers will need.
DESCRIPTION OF PARTS
1.
Cover
2.
Board-fitting support
3.
Gear motor
4.
Anchoring plate
5.
Fastening bolts UNI 5739 M12X60
6.
Washer Ø 12
7.
Nut UNI 5588 M12
8.
Board protecting cover
9.
Control board
10.
Board-housing
11.
Release lever
12.
Lock
13.
Limit-switch fins
14.
EMC02 card
15.
Transformer
16.
Endstop device
17.
Release key
Summary of Contents for OPS series
Page 2: ...3 2 1 1 2 3 4...