background image

1

2

1

2

p.

 

13

 - M

an

ua

FA

010

84

-E

N

 - 0

2/

20

18 - © C

AM

E S

.p

.A

. - "

Tr

an

sl

at

ed o

rig

in

al i

ns

tru

ct

io

ns

"

Spring

For closing:

- completely close the gate;

- fit the closing endstop fin onto the rack until the micro-switch activates (spring); 

- fasten it using the allen screws

 Don't let the gate get to the mechanical stop, whether it is the opening or closing one.

ESTABLISHING THE LIMIT-SWITCH POINTS

For opening:

- completely open the gate;

- fit the opening endstop fin onto the rack until the micro switch activates (spring); 

- fasten it using the allen screws

FASTENING THE GEARMOTOR

Complete the adjusting, fasten the gearmotor to the plate using the washers and nuts.

Summary of Contents for OPS series

Page 1: ...Sliding gate operator OPS series OPS001 INSTALLATION OPERATION AND MAINTENANCE MANUAL EN English FA01084 EN...

Page 2: ...3 2 1 1 2 3 4...

Page 3: ...l grea sed and that it opens and closes smoothly The guide rail must be well fastened to the ground entirely above the surface and free of any impediments to the gate s movement The rails of the upper...

Page 4: ...sm close to the mechanism Make sure to hand over to the end user all operating manuals for the products that make up the final machinery the next figure shows the main hazard points for people Danger...

Page 5: ...f up to 400 kg and 10 m in length INTENDED USE The operator is designed to power sliding gates in residential and apartment block settings Do not install of use this device in any way except as specif...

Page 6: ...nual FA01084 EN 02 2018 CAME S p A Translated original instructions DIMENSIONS MM STANDARD INSTALLATION 1 Operator 2 Limit switch fins 3 Rack 4 Key switch selector 5 Flashing light 6 Photocells 7 Mech...

Page 7: ...t the surface is solid enough set up suitable tubes and conduits for the electric cables to pass through making sure they are protected from any mechanical damage TOOLS AND MATERIALS Make sure you hav...

Page 8: ...pliant For power supplies up to 48 V you can use FROR 20 22 II type cables that comply with EN 50267 2 1 CEI To connect the antenna use the RG58 we suggest up to 5 m For paired connection and CRP use...

Page 9: ...eded for the wiring coming out of the junction pit For connecting the gearmotor we suggest using a 40 mm corrugated tube whereas for the accessories we suggest 25 mm tubes The number of tubes depends...

Page 10: ...frame with concrete The plate must be perfectly level with the bolts which are entirely above surface Wait at least 24 hrs for the concrete to solidify Remove the foundation frame and fill the hole w...

Page 11: ...hreading the cables Lift the gearmotor by 5 to 10 mm from the plate by adjusting the threaded steel feet to allow any subsequent adjustments between pinion and rack SETTING UP THE GEARMOTOR Remove the...

Page 12: ...is prevents the gate s weight from bearing down on the operator FASTENING THE RACK If the rack is already set up the next step should be to adjust the rack and pinion coupling distance otherwise faste...

Page 13: ...ten it using the allen screws Don t let the gate get to the mechanical stop whether it is the opening or closing one ESTABLISHING THE LIMIT SWITCH POINTS For opening completely open the gate fit the o...

Page 14: ...terminal 12 Accessories board fuse 13 Antenna terminal 14 AF card slot 15 Green power module terminal 16 R800 card connector 17 Power supply terminal board 18 Line fuse ELECTRICAL CONNECTIONS AND PROG...

Page 15: ...01084 EN 02 2018 CAME S p A Translated original instructions Accessories power supply output 24 V AC DC max 20 W Control board power supply 24 V AC DC Power supply 230 V AC 50 60 Hz INPUT VOLTAGE Flas...

Page 16: ...tions programming you can activate the OPEN STOP CLOSE STOP command STOP STOP N C contact For stopping the gate while excluding automatic closing To resume mo vement press the control button or use an...

Page 17: ...and the buzzer sounds off for one second Press P1 to return to the default parameters The LED blinks and the buzzer sounds off twice P1 key FUNCTIONS PROGRAMMING Red LED PRG DIP SWITCH SAFETY DEVICES...

Page 18: ...d the buzzer sounds off for one second To return to the default settings press P1 again The LED blinks and the buzzer sounds off twice Self learningof the partial gate travel Using the control button...

Page 19: ...function is enabled To disableit select the DIP switches as shown and press the P1 key on the control board The LED blinks and the buzzer sounds off twice To return to the default setting press P1 ag...

Page 20: ...1 s If the transmitter has previously been saved the LED blinks quickly and the buzzer sounds off 4 times Transmitter activated OPEN CLOSE INVERT Select the DIP switches as shown and press the P1 key...

Page 21: ...ramming phases the automatic closing waiting time and of any errors malfunctions PWR Green It warns about the voltage present in the control board ALERT LED Trimmer Description of functions A C T Auto...

Page 22: ...losing button or the key switch selector is stuck Check main power supply Lock the gearmotor Replace the batteries Call for assistance Call for assistance Call for assistance The gate opens but does n...

Page 23: ...d of as solid household waste and simply separated from other waste for recycling Always make sure you comply with local laws before dismantling and disposing of the product DISPOSE OF RESPONSIBLY DIS...

Page 24: ...lla Libert 15 31030 Dosson di Casier Treviso Italy tel 39 0422 4940 fax 39 0422 4941 Manual FA01084 EN 02 2018 CAME S p A Translated original instructions The contents of this manual may change at any...

Reviews: