
Pa
g.
16
- M
an
ua
l c
od
e:
11
9G
V2
9
v
er
.
2.
0
0
9/
20
10 © C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. -
Th
e d
at
a a
nd i
nf
or
m
at
io
n r
ep
or
te
d i
n t
hi
s i
ns
ta
lla
tio
n m
an
ua
l a
re s
us
ce
pt
ib
le t
o c
ha
ng
e a
t a
ny t
im
e a
nd w
ith
ou
t o
bl
ig
at
io
n o
n C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. t
o n
ot
ify u
se
rs
.
-
After bar opening and closing adjustment, tighten the locking nuts
under the dampers.
- ...reposition the inspection door and top crown.
-
Once you have completed all mechanical and electronic installation procedures,
secure the control panel cover...
-
Turn the key clock wise and lock the protective top
cap using the Ø3,9x13 supplied with the package.
ZL38
ZL38
4
4
3
2
1
Summary of Contents for G4140IZU
Page 1: ...GARD4 SERIES INSTALLATION MANUAL G4140ZU G4140IZU AUTOMATION FOR STREET BARRIERS ...
Page 29: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 30: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 31: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK ...