INSTALLATION
The following illustrations are just examples, as the space available for fitting the operator and accessories varies depending on the area where it is
installed.
The drawings refer to the left-side gearmotor.
Preliminary operations
Set up the junction boxes and corrugated tubes you will need to make connections coming from the junction pit.
An operator (FA70230CB) and a gearmotor (FA70230) must be installed on two-leaf gates .
FA70230CB must be installed on the leaf that must start the opening maneuver first.
FA70230 must be installed on the leaf that must start the opening maneuver subsequently.
The number of tubes depends on the type of system and the accessories that are going to be fit.
Setting up the gearmotor
Carefully remove the gearmotor cover.
4
2
1
2
3
Summary of Contents for FA70230CB
Page 2: ...1 2 3 5 6 4 ...
Page 29: ...Swing gate operator FA70230CB INSTALLATION MANUAL FA01335 EN EN English ...
Page 30: ...1 2 3 5 6 4 ...
Page 57: ...Automatismes pour portails battants FA70230CB MANUEL D INSTALLATION FA01335 FR FR Français ...
Page 58: ...1 2 3 5 6 4 ...
Page 85: ...Автоматика для распашных ворот FA70230CB РУКОВОДСТВО ПО МОНТАЖУ FA01335 RU RU Русский ...
Page 86: ...1 2 3 5 6 4 ...