50
2
1
UNI 5739
12 X 70
M12
84
105
p.
8
- M
anu
al
FA
0
0
9
4
5
-E
N
- 0
1/
2
0
18 - © C
A
M
E S
.p
.A
. - T
ransla
te
d o
riginal inst
ru
ct
io
ns
If the rack is already there, place the anchoring plate, being careful to respect the measurements shown in the drawing.
Fill the foundation frame with concrete. The plate must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Fit the bolts into the anchoring plate and tighten them using the nuts. Remove the pre-shaped clamps using a screw driver or pliers.
Place the plate over the iron cage. Careful! The tubes must pass through their corresponding holes.
FITTING THE ANCHORING PLATE
Set up a foundation frame that is larger than the anchoring plate and sink it into the dug hole. The foundation frame must jut out by 50 mm above
ground level.
Fit an iron cage into the foundation frame to reinforce the concrete.
Summary of Contents for BX708RGS
Page 2: ...2 3 1 2 3 1 ...
Page 30: ...2 3 1 2 3 1 ...
Page 58: ...2 3 1 2 3 1 ...
Page 86: ...2 3 1 2 3 1 ...