![CAME BKV Series Installation Manual Download Page 13](http://html1.mh-extra.com/html/came/bkv-series/bkv-series_installation-manual_487174013.webp)
5 ÷ 10
p.
13
- M
an
u
al
FA
0
1
2
7
4
-E
N
- 1
1/
2
0
18 - © C
A
M
E S
.p.
A
. - T
h
e c
onte
nts of th
is
m
an
u
al
m
ay c
h
an
g
e, at a
ny ti
m
e, a
n
d w
ith
ou
t n
oti
ce
. O
rig
in
al
in
str
u
cti
on
s
Perforate the cable gland, pass the cables through and fi t it into its corresponding housing.
Raise the gearmotor by 5 to 10 mm from the plate by turning the threaded feet, to make room for further pinion
and rack adjustments.
Setting up the operator
Remove the gearmotor cover by loosening the side screws.
Place the operator on top of the anchoring plate.
Careful! The electric cables must pass under the gearmotor case.