E
A
E
A
1
2
Pa
g
.
1
4
14
- M
a
n
u
a
l co
d
e
:
1
1
9
D
V
3
2
11
9
D
V
3
2
ve
r.
1
.0
1.
0
0
8
/2
0
1
0 © C
A
M
E
c
a
n
c
e
ll
i a
u
to
m
a
ti
c
i s
.p.
a
. - T
h
e d
a
ta
a
n
d i
n
fo
rm
a
ti
o
n r
e
p
o
rt
e
d
i
n
t
h
is
i
n
st
a
ll
a
ti
o
n
m
a
n
u
a
l a
re s
u
sc
e
p
ti
b
le to
c
h
a
n
g
e
a
t a
n
y t
im
e
a
n
d w
it
h
o
u
t o
b
li
g
a
ti
o
n
o
n
C
A
M
E
c
a
n
c
e
ll
i a
u
to
m
a
ti
c
i s
.p.
a
. to n
o
ti
fy
u
se
rs
.
(non-issued)
Supplementary bracket
Weld pillar bracket to the non-issued supplementary bracket, while gate is open, then secure the brackets to the pillar,
making sure the “A” and “B” quotas shown in table 1 are met. Weld, or secure with proper screws, the gate bracket, making
sure the “E” quota is met, as shown in table 1. Finally, secure the gearmotor to the brackets with the issued screws and
washers.
5.8 Outward opening installation
Opening
A
(in)
B
(in)
E
(in)
90°
5.11
5.11
31.5
Pillar bracket
Extra bracket
Gate bracket
For AX5024U gearmotors, directly secure the standard issue bracket to the pillar without using the supplementary
bracket, while taking into account the measurements shown in table 2.
Finally, secure the gearmotor to the brackets with the issued screws and washers.
Pillar bracket
Gate bracket
Opening
A
(in)
B
(in)
E
(in)
90°
7.8
8.6
43.3
TABLE 1
TABLE 2