ALL OTHER WALLS
AS PER LOCAL
BUILDING CODE
PIT
BOTTOM FLOOR
SLAB
RAIL WALL SHEATHING
3/4" PLYWOOD
SCREWED TO STUDS
EVERY 12"
WITH #10-2-1/2"
SCREWS MINIMUM
FOR BEST RESULTS
USE A CONSTRUCTION
ADHESIVE
IN ADDITION TO REQUIRED
WOOD SCREWS
SURFACE OF PLYWOOD
FLUSH
WITH WALL OF
PIT
WALLS WITH
DOOR
OPENINGS
MUST HAVE
2"X4" CONSTRUCTION
2"X4"
A
16 14 "
16 14 "
RAIL CENTERLINE
AS PER PROJECT
SHOP DRAWINGS
RAIL WALL CHANNEL
ASSEMBLY
TOP VIEW
- CHANNEL CONSTRUCTION TYPICAL
TWO PLACES
- TWO 2" x 12" INSIDE TWO 2" x 6"
- 2x6s
SCREWED
TO 2x12s
EVERY
6"
WITH
#10x3-1/2" WOOD SCREWS
- CHANNELS AND MIDDLE STUDS
BETWEEN FLOORS
FULL HEIGHT OF
HOISTWAY
MIDDLE STUDS
THREE 2" x 6"
3/4"
PLYWOOD
DOOR
WALL
CAMBRIDGE ELEVATING IS NOT
RESPONSIBLE FOR THE STRUCTURAL
DESIGN OF THE BUILDING AND ITS
ABILITY TO SUPPORT THE ELEVATOR
LOADS AND/OR REACTIONS
R1=720LBS
R2=225LBS
R3=720LBS
WWW.CAMBRIDGEELEVATING.COM
CAMBRIDGE, ONTARIO
THIS DRAWING AND THE INFORMATION IT CONTAINS ARE PROPRIETARY TO
CAMBRIDGE ELEVATING INC. THIS DOCUMENT MUST NOT BE DUPLICATED,
OR ITS CONTENTS USED OR DISCLOSED (IN WHOLE OR IN PART) WITHOUT
THE WRITTEN PERMISSION FROM CAMBRIDGE ELEVATING INC.
1261 INDUSTRIAL RD
Summary of Contents for Cambrian
Page 8: ......