Chapter 5: Installation
Mount the ODU, LPU and surge suppressor
Page
6
The grounding point on PMP 450 Series SM 900 MHz is different from 2.4, 3.5/3.65 and 5 GHz PMP 450
SMs as shown in
Figure 76 PMP 450 900 MHz SM grounding
Mount the ODU on the mast
PMP 450m Series – AP
1
GHz AP on page
Installation for an integrated ODU
2
Remove the rear bracket strap from upper and lower
brackets of ODU
3
Attach the upper and lower bracket of ODU to the mount
point by closing the rear strap around the pole
4
Secure the four-serrated flange M8 nuts by applying 10
Nm torque on upper and lower rear strap using a 13 mm
spanner wrench. These must be tightened evenly on the
pole to avoid jumping/stripping threads
Secure the bolts on four sides by applying 8 Nm torque
as per the angle of the antenna.