CALORIQUE Snow & Ice CM1020 Installation Manual Download Page 3

Silicone Sealant.

Exterior grade silicone used to waterproof the

junction box cover plate.

Control System

. Supplied by CalorIQue, automatically turns

the system on and off based on the temperature and presence

of precipitation. UL Listed and CSA Certified.

Specification Sheet

. Provides specifications for all skid plates

included with the system.

Product Labels

. Provide information about the system that

may be required during future remodeling or repairs.

Warrantee Card.

This card must be filled out and returned to

CalorIQue to ensure proper registration of the warrantee.

Typical system wiring layout. 

Preparation

If necessary, level worn or damaged loading docks with quick

setting leveling compound.

Install and supply power to a junction box located conveniently

for connection to the CalorIQue Heated Skid Plate(s). Make

sure that power is turned off at the distribution panel before

installing this system.

Install control system according to the separate instructions.

Using an accurate ohm meter, test each skid plate to ensure

that it is within the limits shown on the specificatasdfasdfion

sheet.

Installation

Drill Holes to Accept Expansion Shields
Using the skid plate as a template, mark and drill holes for the
expansion shields.

TIP:

Since the exact hole locations may differ from plate to plate, label

each dock area and plate and use the appropriate skid plate to mark
the hole locations.

Place skid plate(s) based on their junction box type, and the type of

railing or edge work. 

Insert the Expansion Shields into the Holes.

Mount the Skid Plate(s). Repeat the following for each plate:

• Apply construction adhesive to the loading dock.

Junction Box
Style 

B

Junction Box
Style 

A

Wall or

Railing

Junction Box
Style 

A

Railing

Skid Plate(s)

Power Distribution Panel

Control Box

Sensors

Reviews: