Page 97
Calorex Heat Pumps Ltd. · The Causeway, Maldon, Essex CM9 4XD, UK
Technical Manual
PPT8/12/16/22LX/LY SLIMLINE
SD638160 ISSUE 22d
®
i
15
MAIN ASSEMBLY PPT 22 ALY
3
2
US
E
OR
29
30
86
2
85
2
12
2
82
OR
90
R
40
7c
EAR
TH
BLO
CK
121
31
415
N
L
56
7
8
9
'Y'
V
R
S
N
O
N
LY
R
E
V
E
R
S
IN
G
V
A
LV
E
W
A
T
E
R
F
LO
W
S
WI
T
C
H
F
A
N
C
A
P
F
A
N
N
F
A
N
L
16
17
18
19
10
11
4
6
7
13
F
A
N
L
OO
M
27
96
97
N
O
T
E
D
IR
E
C
T
IO
N
OF
AR
R
O
W
FI
T W
A
S
H
E
R
S
U
P
P
LI
E
D
F
LO
W
SW
IT
C
H
TO
BE
H
A
N
D
T
IGH
T
(8
N
m
)
D
O
N
O
T U
S
E
A
TO
OL
10
8
OU
T
14
28
17
18
25
78
10
5
93
95
94
8
16
'J'
33
4
.00
R
EF
SWAGE END TO ALLOW
INSERTION OF 3/4" PIPE
DETAIL A
41
8.
00
R
EF
33
4.
0
0
R
E
F
A637827s2
A637827s2
SHOP BUILD
PPT22 ALY
2
3 A1
PJ
1:4
25/01/12
SEE SHEET 1 FOR CURRENT ISSUE NUMBER
C/N
DATE
R
c
U.C.C.
CALOREX HEAT PUMPS LTD
MATERIAL
FINISH
TOLERANCE UNLESS SPECIFIED
HOLES TO BS 4500 E12
INSPECTION LEVEL
DIMS
SHT No.
CONT'
DRAWN
ALL SHARP EDGES AND BURRS TO BE REMOVED
DRG No.
APPROVED
DATE
SCALE
DO NOT SCALE PRINT
3rd ANGLE PROJECTION
IF IN DOUBT ASK
TITLE
DRG No.
DRAWING CHANGE
UNCONTROLLED WHEN PRINTED
WATER TEMPERATURE
SENSOR PROBE POCKET
(SEE FIG.2)
076
098
098
104
088
090
038
089
103
075
101
038
102
077
021
050
051
O92
093
026
070
PROCESS PORT -
PIPE TO BE SEALED AND
SECURED AFTER FINAL TEST
(SEE SHEET 3)
ITEM 21 MUST BE FITTED PRIOR
TO SECURING BASEPLATE TO PALLET
031
091
022
074
040
EARTH STUD
SEE FIG.8 ON
SHEET 4
100
040
052
043
107
2
SEE FIG 4
EVAP STUB DIMENSIONS
SEE DETAIL A
095
ENSURE THAT COIL IS
SECURED TO VALVE BODY
WITH M4 SCREW SUPPLIED
010
080
035
2
040
072
CRUSH JOINT
SEE SHT 4 FIG.9
065
CRIMP INLET PORT
TO CREATE CLOSED SEAL
FIG.2
TEMP PROBE DETAIL
85.00
CONDENSER WATER
TEMPERATURE POCKET
SENSOR PROBE
(PART OF ITEM 20)
C/TIE AROUND
CABLE
C/TIE AROUND
POCKET NUT
PLACE THERMAL MASTIC INTO POCKET
THEN FULLY INSERT PROBE.
036
036
041
INSULATION
GREY
PROBE CABLE
NOTE:
FIXINGS OPPOSITE TO PROBE
DEFROST PROBE
FITTED TO EVAPORATOR
MANIFOLD. SEE FITTING
INSTRUCTIONS D389750.
CABLE TO ENTER
FROM UNDERSIDE.
IMPORTANT:
MAINTAIN DRIP LOOP
AS SHOWN
FIG 3
SHOWING DEROST PROBE POSITION
105
066
067
068
2
2
2
019
037
036
3
1
40
.00
EVAP
ITEM 52
BAFFLE PLATE
INSULATION
FIG.4
ITEM 107
J
ITEM 107
N
21
85
COND
E
NS
ER
W
AT
E
R
T
E
M
P
ERA
T
URE
P
OCK
ET
SE
NS
OR P
ROB
E
(PA
RT
OF
IT
E
M
20)
CA
BL
E
CAB
LE
T
IE
A
ROUN
D
P
OCK
ET NUT
P
LA
CE
T
HE
RM
A
L M
A
STI
C
INT
O P
OCK
ET
T
HE
N FULLY
INSE
RT
P
ROB
E
.
INS
ULA
T
ION
GRE
Y
P
ROB
E
CAB
LE
NOT
E
:
FI
X
INGS
O
P
PO
SI
T
E
T
O
PRO
BE
CAB
LE
T
O
ENT
E
R
FRO
M
UNDERS
IDE
.
IM
PO
RT
A
NT
:
M
AI
NT
A
IN DRI
P
LOOP
AS
SHO
W
N
105
19
140
21
31
98
22
23
26
CA
BL
E
T
IE
ARO
UND
24