The selection of fuse and breaker must strictly follow the data in table 3.

 

 

Choose the suitable power wire according to table 3 and local codes. 

 

 
Take off the service cover of the generator, insert the 3-core power wire (single phase, 240V

 

60Hz ) into the hole at the back of the generator case and connect to the correct terminal.    (Refer to 
figure 9

,10

). 

Single  phase,  240V

60Hz  power  supply:

  connect  one  of  the  live  wires  to  the  terminal 

labeled  as  “

L1

”  ;  connect  the  other  live  wire  to  the  terminal  labeled  as  “

L2

”  ;  and  connect  the 

ground wire to the terminal labeled as 

”. 

 

240VAC60Hz

CONTROL 
WIRE

CONTROLLER

N

 

GND

 

ZQJ0806  
No

100615

MAIN 
BOARD

SUB-BOARD ZQJ-FB4.PCB

TERMINAL

K3

K1

K4

C

O

N

1

K2

ZQ

J-

F

B

4

.P

C

B

GND
V12
K2
K4
K6
K1
K5
K3

L1

 

    L2

  

No 100615

GND

K3

K5

K1

K6

K4

K2

GND

LOW 

Water level Probe

DRAIN

HIGH

GND

ZQJ0806

DR

4

5

m

in

POWER IN

L

N

JUMP

K3

BT1

J2

D6

D5

P3

P1

P2

D4

D3

D2

D1

TEST

J1

SW1

ON

SW2

ON

IN VALVE

J5

D VALVE

J6

LAMP

J7

J3

K1

K4

J1

-1

 

Summary of Contents for NTC-120

Page 1: ...Calor de Hogar Av Tecnol gico 735 PB San Salvador Tizatlalli Metepec 52172 Edo de M xico Tel fono 722 216 3330 55 1163 6038 www calordehogar com servicio calordehogar om c ventas calordehogar com...

Page 2: ...Content 1 Introduction 2 Chapter 1 Parameters 3 Chapter 2 Installation and Cautions 5 Chapter 3 Functions and Operation 12 Chapter 4 Maintenance 14 Chapter 5 Troubleshooting 15 Chapter 6 Warranty and...

Page 3: ...ual for further reference ATTENION This appliance is not intended for use by person with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given...

Page 4: ...120 12 0 6 2 0 240 50 Table 1 Figure 1 1 Frame 2 Service panel for water level sensor 3 Auto drain motor 4 Drainage valve 5 Connector 6 T pipe 7 inlet magnetic valve 8 Side cover 9 Drainage pipe 10 Pi...

Page 5: ...ontrol Panel 12 Water Tank 13 Safety Valve MAIN PCB CONTROLLER POWER SUPPLY 13 Figure 2 2 Controller parameters and dimension Model Controller model Controlling time range minutes Temperature display...

Page 6: ...tallation No block valve should be installed in the steam pipelines Strictly no blocked or blended pipe otherwise have negative affect on the flow of steam and condensate The steam pipelines should be...

Page 7: ...4 i Install the generator on the wall drill two small holes on the wall insert the expansion screws and then hang the generator on those screws ii Install the generator on the ground or deck Install...

Page 8: ...L WIRE CONTROLLER WALL CONDUIT SENSOR WIRE CONNECTOR 2P CONTROL WIRE CONNECTOR 6P SEALING GLUE Figure 4 Figure 5 TEMP SENSOR IMMOBILIZING PLATE IMMOBILIZING SCREW WALL SENSOR WIRE Figure 6 4 Installat...

Page 9: ...pe is required to drain water to the drainage All inlet water pipes and steam pipelines should be built according to the National Standard refer to Figure 7 and this should be done before sealing the...

Page 10: ...and repair After the installation of the pipeline and electrical circuits careful checking must be performed before switch on the generator The generator has been carefully installed checked and test...

Page 11: ...60Hz power supply connect one of the live wires to the terminal labeled as L1 connect the other live wire to the terminal labeled as L2 and connect the ground wire to the terminal labeled as 240VAC60...

Page 12: ...L TEMP SWITCH HEATING ELEMENTS CONTROLLER WATER LEVEL SENSOR K3 K1 K4 CON1 K2 ZQJ FB4 PCB GND V12 K2 K4 K6 K1 K5 K3 L1 240VAC60Hz L2 No 100615 GND K3 K5 K1 K6 K4 K2 GND LOW Water level Probe DRAIN HIG...

Page 13: ...K1 K3 K5 K6 K3 K2 K1 K6 K5 CON1 K4 J1 1 K4 K1 J3 J7 LAMP J6 D VALVE J5 IN VALVE ON SW2 ON SW1 J1 TEST D1 D2 D3 D4 P2 P1 P3 D5 D6 J2 BT1 K3 JUMP N L POWER IN 45min DR ZQJ0806 GND HIGH DRAIN Water leve...

Page 14: ...remaining working time is within range of 40 50 minutes all LEDs are on when the remaining working time is within range of 50 60 minutes The default working time is 45 minutes If the system is in lon...

Page 15: ...temperature and time setting otherwise if the system is shut off automatically when setting time is up system will adapt the previous temperature and time setting Then system begins to heat up and pro...

Page 16: ...r ON OFF button is pressed system will drain automatically and displays d on the LCD The drainage valve and the drainage pump will be turned on to drain After a while the system will open the inlet va...

Page 17: ...blue wire and the two white wires respectively Take off all the wires screw out the water level sensor and screw in the new water level sensor until the bottom of the plastic nut reaches the same hei...

Page 18: ...magnetic valve 4 If the system keeps on heating up even if the current temperature is more than 4 above the setting value with the indicator on carefully test the relays on the sub board and change th...

Page 19: ...d altered damaged is not covered either Using in a salty environment or any other extreme corrosive condition is not covered by the warranty After the free warranty period services are still available...

Page 20: ...Calor de Hogar Av Tecnol gico 735 PB San Salvador Tizatlalli Metepec 52172 Edo de M xico Tel fono 722 216 3330 55 1163 6038 www calordehogar com servicio calordehogar om c ventas calordehogar com...

Reviews: