LOCATION
INSTALLATION AND MAINTENANCE
All metallic components of the machine, in direct contact with drinking
water are manufactured from high quality 316 grade stainless steel, or
non-ferrous materials, providing maximum resistance to corrosion.
CONSTRUCTION
To comply with recommendations from the
Health and Safety Executive it is important that
due consideration be given to safe operation
of the controls of the boiler. The boiler should
therefore be positioned in such a manner
that the operator can stand directly facing the
machine with the controls at a recommended
height from the floor to the draw-off tap handle
of /- 200mm.
The boiler must be installed in a location where access is restricted
to operators that are suitably trained, or where untrained operators of
the machine can be supervised by trained personnel.
Consideration should also be given to the servicing requirements of the
machine and individual user requirements must always be taken into
account. The minimum and maximum ambient operating conditions
are 5 °C and 35 °C respectively. The appliance is not suitable for
installation where a water jet could be used. Install the boiler on a
surface suitable for the working weight of the boiler. Allow clearance
for ventilation and for the easy removal of the outer casing lid and
front panel. Calomax recommend a minimum clearance of 50mm on
all sides of the boiler. A suitably qualified engineer should install this
unit. Plumbing and electrical installation work may be involved.
Calomax products have been tested and found to
comply with the requirements of the Water Supply
(Water Fittings) Regulations 1999 for England and
Wales Water Bylaws 2000, Scotland and the Water
Regulations Ireland.
Page 4