Calix ODC-80 Installation Guide
15
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2003 Calix. All Rights Reserved.
What you need to bring
Customer-supplied tools for cabling
You need to bring the following tools for cabling.
•
compression connector crimper
•
screwdriver set (standard)
•
socket wrench set (standard)
•
box wrench set (standard)
•
fiber cleaver
•
fusion splicer
•
Modular MS2 splice tool
Customer-supplied materials for cabling
You need to bring the following materials to install cabling.
•
copper pigtail with MS2 terminators, long enough to get to your cross-connect box
•
#2 AWG 2-hole compression lug (options are 5/8", 1", or 1 1/4")
•
fiber optic cable for splicing into cabinet
•
#2 AWG strain relief for ground wire
•
#2 AWG strain relief for AC cabling
Test equipment
Depending on the system configuration, the following test equipment may be needed:
•
Digital Volt/Ohm meter
•
Bit Error Rate tester
•
Analog test set (for testing POTS lines)
•
DS1 test set
•
DS3 test set
•
ADSL test set
•
Optical power meter
Summary of Contents for ODC-10
Page 1: ...Calix ODC 80 Installation Guide July 2003 Part 220 00029 Rev 11...
Page 2: ......
Page 6: ......
Page 7: ...1 Chapter Before You Begin Installing the ODC 80...
Page 8: ......
Page 23: ...2 Chapter Placing the ODC 80 on a Pad...
Page 24: ......
Page 30: ......
Page 31: ...3 Chapter Installing Power Subscriber Cables and Equipment...
Page 32: ......
Page 74: ......
Page 75: ...4 Chapter Maintaining and Troubleshooting the ODC 80...
Page 76: ......
Page 80: ......
Page 92: ......
Page 103: ...5 Chapter Reference...
Page 104: ......
Page 106: ......