Caley Coaches CL02/2a Building Instructions Download Page 8

Caley Coaches  

 

CL02/2a Building Instructions

Page 8

Section 7  Boiler and smokebox

7.1  No cut-out for the motor and gears is provided in the boiler wrapper or the brass boiler tube since 

the size of cut-out required will be dependent on your motorising arrangement. To determine the 

size of cut-out required, temporarily mate the footplate and cab assembly with the chassis and 

measure the distance over the motor from the cab front. Also note the width required. Transfer 

these measurements to the boiler tube and cut it to suit. Check the tube in position and adjust as 

required.

7.2  Roll the boiler wrapper.

7.3  The two cuts in the boiler/smokebox/firebox wrapper need extended so that, when the wrapper 

is wrapped round the boiler tube it is 14mm long. (i.e. extends 7mm either side of the centre line). 

The two sides of the lower firebox should then be folded back as shown in the diagram. Use the 

firebox front (part 26) as guide when doing this.

7.4  Now transfer the dimensions of your motor cut-out from the boiler tube to the wrapper and 

remove any surplus material.

7.5  A photograph of your prototype is now essential. If you are modelling later L.M.S. or B.R. days 

then the smokebox is probably riveted. If so, push out the rivets from the rear on the smokebox 

outer wrapper and front (part 26) using a map tack - there are some spare rivets on the fret to 

practice your technique on. Roll the smokebox wrappers and then fold back the lower portions 

such that the shape of the part matches the rivet line on the back of the smokebox front (part 24). 

The diagram below shows the approximate shape :-

7.6  Seam solder the wrapper to the tube at front and rear and along the edges of the cut-out. Also 

Summary of Contents for CL02/2a

Page 1: ...Durham DH3 3RY www highlevelkits co uk 3 Wheels 5 0 diameter 16 spoke driving wheels and 4 0 diameter 12 spoke tender wheels 4 Paint and transfers 5 Couplings Section 1 Parts list Please check the co...

Page 2: ...d 812 34 Reversing lever 35 Strips for lamp irons 3 2 Additional etched loco body parts Boiler smokebox rebox Inner smokebox wrapper Outer smokebox wrapper 3 Loco chassis etch containing Chassis frame...

Page 3: ...kpin of the wheels you intend to use Section 4 Locomotive Chassis 4 1 Remove the sideframes from the fret and decide which is to be the driven axle this will be the rear if you are following my recomm...

Page 4: ...nment of both sides solder the hornblocks to the sideframes d Repeat from a using the other sections of the coupling rods and the centre axle as the reference point for the other axle 4 6 Remove the c...

Page 5: ...e ride height of the compensated chassis may be adjusted by tweaking the ends of the beam up or down 5 9 Glue the balance weights in place on the wheels large one on the central wheels A photograph of...

Page 6: ...of the front correct and that the parts are square to each other Carefully shape the rear wheel splashers to the pro le of the cab side as you work In a similar manner solder on the other side 6 3 Sol...

Page 7: ...strip This will help iron out any minor discrepancies in the shape of the roof 6 11 Solder the other two stanchions to the front and rear of the roof and the front and rear strips part 14 to the roof...

Page 8: ...14mm long i e extends 7mm either side of the centre line The two sides of the lower rebox should then be folded back as shown in the diagram Use the rebox front part 26 as guide when doing this 7 4 N...

Page 9: ...otor etc 7 10 Solder the smokebox front part 24 to the boiler smokebox assembly Line up the handrail knob hole on the front with the chimney location hole to keep things in line 7 11 Solder the boiler...

Page 10: ...the outside or top Now solder the half etched section to the curved portion of the splasher shaping as you go Drill the top at section centrally to take the sandbox ller and t Again remember to make a...

Page 11: ...2 per side and the grab rails above the centre steps Solder these in place 8 10 Check that the handrail knob hole on the smokebox front is clear and drill holes for the other handrail knobs as shown...

Page 12: ...d make up the pipes from the 1mm rod supplied 8 16 Some locomotives also acquired vacuum injectors in L M S days running from the smokebox to the cab either above or below the handrail on the left han...

Reviews: