Commissioning

Filling the central heating system

Open the shut-off valves (not supplied) on the connections to the

centralised  line  and,  in  the  central  heating  system,  proceed  with

filling the system to the design pressure. Once these procedures

are complete, vent the system and check its pressure again (repeat

the filling process if necessary).

Exchanger preheating function

In  order  to  keep  pipe  sections  between  the  risers  and  the

apartment heating system from cooling and consequently to speed

up the response to demands for DHW production, SATK12313 HIU

is  equipped  with  a  manual  by-pass  that  makes  it  possible  to

maintain  a  minimum  flow  of  water  circulating  through  the  heat

exchanger primary circuit.

To activate the preheating function turn knob (A).

Maintenance

All maintenance procedures should be carried out by an authorised

technician.

Regular  maintenance  guarantees  better  efficiency  and  helps  to

save energy.

Before  carrying  out  any  maintenance,  repairs  or  replacement  of

parts, proceed as follows:

- Close the shut-off valves

- Empty the HIU.

Heat exchanger replacement

- Remove the heat exchanger by loosening the 2 hex socket fixing

screws (B)

- Replace the heat exchanger and the O-rings.

- Tighten the two fixing screws to a maximum torque of 3 N·m (B).

2

Installation

The  SATK  series  HIU  is  designed  for  installation  in  a  sheltered

domestic environment (or similar), therefore it cannot be installed or

used  outdoors,  i.e.  in  areas  directly  exposed  to  the  elements.

Outdoor installation may cause malfunctioning and hazards. 

If the device is enclosed inside or between cabinets, sufficient space

must be provided for routine maintenance procedures. It is advisable

to avoid positioning electrical devices under the HIU as they may be

damaged in the event of leaks from hydraulic fittings. If this advice is

not  heeded,  the  manufacturer  cannot  be  held  responsible  for  any

resulting  damage.  In  the  event  of  a  malfunction,  fault  or  incorrect

operation,  the  device  should  be  deactivated;  contact  a  qualified

technician for assistance.

Preparation

After  having  established  the  point  of  installation  of  the  device,

perform the following operations:

• Mark the holes required to secure the HIU to the wall

• Mark the position of the hydraulic connections

Check the measurements again and begin laying the following lines:

1. connection to the centralised line

2. heating circuit connection

3. domestic water circuit connection.

Before installation, it is recommended to carry out accurate flushing

of  all  the  pipes  of  the  system  in  order  to  remove  any  residue  or

impurities that could endanger correct operation of the HIU. Fix the

HIU to the wall.

N.B.: 

the  wall  anchors  can  only  guarantee  effective  support  if

inserted correctly (in accordance with good technical practice) into

walls made of solid or semi-solid bricks. If working with walls built

using  perforated  bricks  or  blocks,  mobile  dividing  panels  or  any

masonry  walls  other  than  those  indicated,  a  preliminary  static  test

must be carried out on the support system. 

Hydraulic connections

Hydraulic connections to the centralised line must be made using

manual shut-off valves which allow any necessary maintenance work

to be carried out without having to empty the centralised system.

It  is  advisable  to  install  manual  shut-off  valves  also  on  the  lower

terminals for connection to the apartment heating system.

Make sure all connections are perfectly watertight.

WARNINGS 

These instructions must be read and understood before installing and maintaining the device.

CAUTION! FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN A SAFETY HAZARD!

CAUTION!

THE PRODUCT SUPPLIED WITH THIS INSTRUCTION SHEET WILL BE DESIGNATED “DEVICE” HEREINAFTER

1 The device must be installed, commissioned and maintained by qualified technical personnel in accordance with national regulations and/or applicable local bylaws.

2 If the device is not installed, commissioned and maintained correctly in accordance with the instructions provided in this manual, it may not work properly and may

endanger the user.

3 Clean the pipes of any particles, rust, incrustations, limescale, welding slag and any other contaminants. The hydraulic circuit must be clean.

4 Make sure all connection fittings are watertight.

5 When connecting water pipes make sure the threaded connections are not mechanically overstressed. Over time this may result in breakage, causing water damage

and/or personal injury.

6 Water temperatures higher than 50°C can cause severe burns. When installing, commissioning and servicing the device, take the necessary precautions so that

these temperatures do not constitute a threat for personal safety.

7 In the case of particularly hard or impure water, there must be suitable provision for filtering and treating the water before it enters the device, in accordance with

statutory legislation. Otherwise the device may be damaged and will not work properly.

8 Any use of the device other than its intended one is prohibited.

9 Any combination of the device with other system components must be made taking the operational characteristics of both units into consideration. An incorrect

combination could impair operation of the device and/or system.

LEAVE THIS MANUAL AS A REFERENCE GUIDE FOR THE USER. DISPOSE OF THE PRODUCT IN COMPLIANCE WITH CURRENT LEGISLATION

THE MANUFACTURER RESERVES THE RIGHT TO CEASE PRODUCTION AT ANY TIME AND TO MAKE ANY CHANGES DEEMED USEFUL OR NECESSARY

WITHOUT THE OBLIGATION OF PRIOR NOTICE.

SAFETY INSTRUCTIONS

A

B

Reviews: