background image

Installation

Before installing a Caleffi 2521 series mixing valve, the system

must be inspected to ensure that its operating conditions are

within the range of the mixer, checking, for example, the supply

temperature, supply pressure, etc.

Systems where the Caleffi 2521 series mixing valve is to be

fitted must be drained and cleaned out to remove any dirt or

debris which may have accumulated during installation.

Failure to remove

dirt or debris may affect performance

and the manufacturer's product guarantee.

The installation of filters of appropriate capacity at the inlet

of the water from main supply is always advisable.

In areas which are subject to highly aggressive water,

arrangements must be made to treat the water before it

enters the valve.

Caleffi 2521 series mixing valve must be installed in accordance

with the diagrams in this manual, taking into account all current

applicable standards.

Caleffi 2521 series mixing valve can be installed in any position,

either vertical or horizontal.

The following are shown on the valve body:

- Hot water inlet, color red and marked “HOT”.

- Cold water inlet, color blue and marked “COLD”.

- Mixed water outlet, marked “MIX”.

It is essential that access to the valve is totally unobstructed for

any maintenance which may be required to the valve or

connections. The pipework from/to the valve must not be used to

support the weight of the valve itself.

Use

Thermostatic mixing valves are typically installed at the

outlet of hot water storage tanks in solar systems to ensure

constant temperature of the mixed water supplied to the end user.

Because of their flow characteristics, the valves can be installed

to control the temperature for both single point of use and for point

of distribution. In order to guarantee the delivery of mixed water at

the set temperature, the 2521 series thermostatic mixing valves

must have a minimum flow rate of 1.3 gpm.

Summary of Contents for 2521 Series

Page 1: ...rials Body Low lead brass 0 25 Lead content chrome plated Shutter PSU Springs Stainless steel Seals EPDM Setting range 85 150 F 30 65 C Accuracy 3 F 2 C Max working pressure static 200 psi 14 Bar Max...

Page 2: ...ommissioning and maintenance of the thermostatic mixer take the necessary precautions to ensure that such temperatures do not endanger people CAUTION In the case of highly aggressive water arrangement...

Page 3: ...een the hot and cold water passages Even when there are pressure drops due to the drawing off of hot or cold water for other uses or variations in the incoming temperature the mixer automatically regu...

Page 4: ...diagram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Regulating knob Head fixing screw Regulating spindle O Ring seal Upper shutter seat Thermostatic element Inner shutter O Ring Outer shutter O Ring O...

Page 5: ...manual taking into account all current applicable standards Caleffi 2521 series mixing valve can be installed in any position either vertical or horizontal The following are shown on the valve body H...

Page 6: ...agrams COLD BLUE HOT RED MIX Key to symbols Safety relief valve Isolation and check valve Isolation valve Expansion vessel Filter HOT COLD MIX MIN MAX 7 1 2 HOT COLD CALEFFI MIN MAX 7 1 2 T Normally c...

Page 7: ...red Unscrew the head screw pull off the handle and reposition it so that the handle fits into the internal slot of the knob Tighten the head screw Maintenance In service tests should be carried out re...

Page 8: ...oad Milwaukee WI 53208 T 414 238 2360 F 414 238 2366 CALEFFI Safety The thermostatic mixer must be installed by a licensed plumber in accordance with national regulations and or relevant local require...