PH
-SERIES
iii
TABLE OF CONTENTS
1.0
OWNERS RESPONSIBILITY --------------------------------- 1
INSTALLER RESPONSIBILITY------------------------------ 3
CODE COMPLIANCE ------------------------------------------ 5
SPECIFICATIONS: GENERAL SPECIFICATIONS -------- 6
PATIO HEATER SIDE DIMENSIONS ----------------------- 7
INSTALLATION CLEARANCES AND CLEARANCE TO
COMBUSTIBLES ------------------------------------------------------- 9
PRE-INSTALLATION INSPECTION: --------------------- 11
INSTALLATION ---------------------------------------------- 12
PLANNING ---------------------------------------------------------- 12
ASSEMBLY OF COMPONENTS ---------------------------- 13
GENERAL INSTRUCTIONS --------------------------------------- 13
SUSPENSION DETAILS ------------------------------------------- 14
CHAIN MOUNTING --------------------------------------------------- 14
RIGID MOUNTING ---------------------------------------------------- 15
ASSEMBLY OF COMPONENTS ---------------------------- 16
---------------------------------------------- 16
COMPONENT ASSEMBLY --------------------------------------- 17
JOINT HANGER TO REFLECTOR (PH-50 & 75 MODELS) ------ 17
CLAMP COUPLER (PH-50 & 75 MODELS) ----------------------- 18
END CAP TO REFLECTOR (PH-50 & 75 MODELS) -------------- 18
90° ELBOW KIT (PH-50 & 75 MODELS) -------------------------- 19
180° U-BEND KIT (PH-50 & 75 MODELS) ------------------------ 19
VENTING REQUIREMENTS ------------------------------- 20
VENTING ------------------------------------------------------------ 22
ANSI Z83.20-2016/CSA 2.34-2016 ----------------------------- 22
GAS PRODUCTS NO. 405 ------------------------------------------ 22
JANUARY 1, 2019 --------------------------------------------------- 22
GAS PIPING --------------------------------------------------- 29
GAS CONNECTION ------------------------------------------ 30
HARD PIPE -------------------------------------------------------------- 30
FLEX CONNECTOR ---------------------------------------------------- 30
ELECTRICAL CONNECTION 120 VOLTS --------------- 32
120 VOLT WIRING DIAGRAM --------------------------------- 33
ELECTRICAL CONNECTION 24 VOLT (ALTERNATE
POWER SUPPLY) ---------------------------------------------------- 34
24 VOLT WIRING DIAGRAM ----------------------------------- 35
INITIAL START-UP ----------------------------------------- 36
SETTING MANIFOLD PRESSURE ------------------------------ 37
GAS INPUT RATE ------------------------------------------- 41
SEQUENCE OPERATION ----------------------------------- 42
DESCRIPTION OF 3-TRY DIRECT SPARK IGNITION
SYSTEM: ---------------------------------------------------------------------- 42
OPERATION: ------------------------------------------------------- 42
POWER UP/STANDBY ------------------------------------------------ 42
HEAT MODE ------------------------------------------------------------ 42
FLAME FAILURE - RE-IGNITION ------------------------------------ 42
TROUBLESHOOTING--------------------------------------- 43
NO POWER TO HEATER---------------------------------------------- 43
INITIAL ELECTRICAL CHECKS ---------------------------------------- 43
INITIAL GAS CHECKS -------------------------------------------------- 44
ELECTRICITY AND GAS TO HEATER, BUT STILL INOPERATIVE 44
CHECK CONTROL BOARD -------------------------------------------- 45
FAULT CONDITIONS -------------------------------------------------- 45
INTERNAL CONTROL FAULT ---------------------------------------- 45
AIRFLOW FAULT - LOCK OUT (COMBUSTION AIR FLOW
PROBLEMS) ------------------------------------------------------------------- 45
FLAME WITH NO CALL FOR HEAT (FLAME FAULT) ------------ 46
IGNITION LOCK OUT (FAILURE TO LIGHT) ----------------------- 46
FLAME SENSOR CURRENT CHECK --------------------------------- 46
PROPER ELECTRODE LOCATION ----------------------------------- 47
MAINTENANCE ---------------------------------------------- 48
CHECK COMBUSTION AIR INTAKE FOR BLOCKAGE. ----------- 48
CHECK EXHAUST TERMINAL FOR BLOCKAGE. ------------------ 48
OPEN SERVICE DOOR. ----------------------------------------------- 48
CHECK BLOWER MOTOR AND SCROLL FOR DIRT AND/OR
IF BURNER NEEDS CLEANING, REMOVE BURNER HEAD FROM
MAKE SURE ALL WIRING IS INTACT AND IN GOOD
CONDITION. ------------------------------------------------------------------ 48
CHECK ELECTRODE FOR PROPER GAP AND CLEANLINESS.
CLEAN OR REPLACE AS NECESSARY. ------------------------------------ 48
CHECK IGNITION SYSTEM FOR SPARK. REPLACE AS
NECESSARY. ------------------------------------------------------------------ 48
CHECK EXCHANGER TUBE FOR HOLES AND/OR CRACKS, DIRT
AND/OR DEPOSITS. CLEAN AND/OR REPLACE AS NECESSARY. --- 48
WASH ANY DIRT OR JUST OFF OF THE UNIT WITH A SOAP
AND WATER SOLUTION. --------------------------------------------------- 48
CHECK ANY GAS CONNECTIONS THAT WERE DISCONNECTED
TURNING CONTROL “ON”. MAKE SURE
UNIT IS OPERATING QUIETLY AND EFFICIENTLY. --------------------- 48
PERIODICALLY VISUALLY CHECK BURNER THROUGH VIEW
PORT TO CONFIRM PROPER OPERATION. ----------------------------- 48
CHECK ALL COUPLERS FOR TIGHTNESS AND/OR LEAKAGE. - 48
PARTS: --------------------------------------------------------- 49
BURNER HEAD AND RELATED PARTS------------------------ 49
REFLECTOR AND TUBE PARTS --------------------------------- 50
PARTS LIST: --------------------------------------------------------- 51
WARRANTY -------------------------------------------------- 53
CONVERSION KIT FOR VARIABLE INPUT GAS VALVES
EXAMPLE OF CONVERSION KIT LABEL ---------------- 56
SAFETY AND OPERATING INSTRUCTIONS ------------ 57