background image

STEP 7:  INSTALL & ADJUST BOTTOM ROD 

The rod length can be adjusted by the thread of the rod, adjust the 

correct length when door is in the opened position,by aiming the 

rod to the hole of the part (Q) 

rod connector 

STEP 8: INSTALL LATCH COVERS & ROD GUIDE 

( 1) Install latch covers and fix/tighten them with screws (A).

( 2) Put rod guide midway between head cover and latch. Then, fix & tighen rod

guide with screws (F).

(A*4) 

� 

(F*2) 

STEP 9: TEST PUSH RAIL & THE DOGGING FUNCTION 

1.

The latches should engage the strikes when the door is closed. If the door can be pushed to open

without depressing the push rail, please check the rod length and installation(see step 3)

2.

The latches should disengage from the strikes freely when the push rail is depressed or dogged down.

If not, please check the rod length/installation again (see step 3)

3.

When applying outside trims:

(1). No trims  :  Exit only, latch bolts are retracted just by the push rail inside.

(2). Entrance : latch bolts are retracted by trim outside after the trim unlocked.

(3). Storeroom  :  latch bolts are retracted by trim outside with key only.

(4). Passage : latch bolts are retracted by trim outside always open.

4. Dogging:Use dogging hex key and turn clockwisely 90

° 

when depressing push rail.  Latch bolts will

remain retracted.

CAL-ROYAL PRODUCTS, INC. USA I VERSION 2022 

(Q)

EDG-404

5

-01/23-

7

 of 

8

Summary of Contents for 98-3PT

Page 1: ...ide 4 J A 2 7 PARTS LIST DESCRIPTION Q TY MATERIAL Noo Rre Are PUSH RAIL 1 STEEUS304 MOUNTING RAIL 1 STEEUS304 HEAD COVER 1 AUZINCISTEEUS304 CHASSIS ASSY 1 STEEL SLIDING COVER 1 STEEUS304 BRACKET 1 S...

Page 2: ...Reverse Bevel LHR D ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 A B1 B2 C D E F Outside Outside C ri fiF Lr Push ide 4 J A 2 7 PARTS LIST Q TY DESCRIPTION Non Are Are MATERIAL PUSHRAIL 1 STEEUS304 MOUNT...

Page 3: ...to its marked location With establishment of pushbar then go for next step of other installations Regularly furnished unless ordered separately INSIDE OF LHR DOOR IS ILLUSTRATED DOOR STOP__ _ r TOP OF...

Page 4: ...bolt E for NON FIRE RATED please use screw B2 directly e I 28 CUT DEVICE IF REQUIRED 1 Device length A must be at least 1 38mm s orter than B Measure from the edge of head cover not from the edge of...

Page 5: ...latch and strike which is about 2 0mm CAL ROYAL PRODUCTS INC USA IVERSION 2022 2 Follow TEMPLATE to install top latch with two screws 82 then screw 81 B2 2 0 0 0 5 Insert the Pin through the latch ca...

Page 6: ...st the proper gap between bottom latch and strike which is about 3 0mm tighten screw B2 firmly and then screw B1 g ____ Mortise in strike is optional Please use its TEMPLATE for installation The rod l...

Page 7: ...without depressing the push rail please check the rod length and installation see step 3 2 The latches should disengage from the strikes freely when the push rail is depressed or dogged down If not p...

Page 8: ...Press Lift Arm Y and ensure the direction before changing Turn Z 180 and put it back as figure shown CAL ROYAL PRODUCTS INC USA IVERSION 2022 8 Unscrew X and take off Z RHR Fasten X at above screw hol...

Reviews: