background image

STEP 1:  MARK CETNER LINES 

Mark Center Lines on INSIDE of door .Establish the  horizontal center line of the device by drawing a line 

across the door 41" ( 1041 mm) above floor line . Establish the top and bottom rod backset center line by 

drawing a vertical line from the top to bottom of the door measuring from the DOOR STOP. After marking 

& drilling, please install pushbar according to its marked location.  With establishment of pushbar, then go 

for next step of other installations. 

Regularly furnished unless ordered separately. 

INSIDE OF LHR DOOR IS ILLUSTRATED 

DOOR STOP __ _

r--TOP OF DOOR 

� 

1-

- --

_

_J 

___ 

7l 

1

-��f 

@  I 

---e--- -e--

I

BAC !(SET 

I  * 

for "FIRE RA TED" : please drill 

....J� 

-

<t>¾"(9.6mm) hole for sex bolt 

1

I  I  / 

for "NON-FIRE RA TED" : please 

-+-�-+

-

--

-

-8

(

..........,

8"+----------

:

--+

/

---.1V.

use screw B2 dlrecdy 

..,____._+--e-++-++-

�-----------+--+-1 

I§ 

� 

� 

-e-

1

�-

Ii 

I  �

(Non fire rated type shown) 

I-

a> 

E  ..-

I

O

�C!) 

See Template  ,/

,,,,

8 ;---

a> 

QI  ..... 

(  �  of Top Rod & Bottom Rod) 

-e-- -e--

� 

-=- � 

"''-----

FLOOR LINE 

CAL-ROYAL PRODUCTS, INC. USA I VERSION 2022 

EDG-4043- 01/23 - 3 of 8 

Summary of Contents for 22-3PT

Page 1: ...h ide 4 J A 2 PARTS LIST DESCRIPTION PUSH RAIL MOUNTING RAIL HEAD COVER CHASSIS ASSY SLIDING COVER BRACKET END CAP TOP LATCH LATCH COVER TOP ROD TOP STRIKE BOTTOM LATCH BOTTOM ROD ROD GUIDE STRIKE DOG...

Page 2: ...A B1 B2 C D E F Outside Outside C ri fiF Lr Push ide 4 J A 2 PARTS LIST DESCRIPTION Q TY MATERIAL Non Are Are PUSH RAIL 1 STEEUS304 MOUNTING RAIL 1 STEEUS304 HEAD COVER 1 AUZINC STEEUS304 CHASSIS ASSY...

Page 3: ...o its marked location With establishment of pushbar then go for next step of other installations Regularly furnished unless ordered separately INSIDE OF LHR DOOR IS ILLUSTRATED DOOR STOP__ _ r TOP OF...

Page 4: ...sex bolt E for NON FIRE RATED please use screw B2 directly e I 28 CUT DEVICE IF REQUIRED 1 Device length A must be at least 1 38mm shorter than B Measure from the edge of head cover not from the edge...

Page 5: ...p latch and strike which is about 2 0mm CAL ROYAL PRODUCTS INC USA IVERSION 2022 2 Follow TEMPLATE to install top latch with two screws 82 then screw 81 B2 2 0 0 0 5 Insert the Pin through the latch c...

Page 6: ...st the proper gap between bottom latch and strike which is about 3 0mm tighten screw B2 firmly and then screw B1 g ____ Mortise in strike is optional Please use its TEMPLATE for installation The rod l...

Page 7: ...without depressing the push rail please check the rod length and installation see step 3 2 The latches should disengage from the strikes freely when the push rail is depressed or dogged down If not p...

Page 8: ...ress Lift Arm Y and ensure the direction before changing Unscrew X and take off Z RHR X ____ t Y Turn Z 180 and put it back as figure shown Fasten X at above screw hole position Press Lift Arm Y to en...

Reviews: