14
Remove the four screws
on the furnace, located
on the side of the desired
installation.
Keep
the
screws.
Align the holes of the link board
housing with the holes on the side of
the furnace. Use the screws removed
in the previous step to secure the
housing to the furnace.
Once installed, the link board must be
connected to the power board with the
telecommunication wire. The wire is
located in the blower box. To access
it, remove the duct support.
Summary of Contents for PF01302
Page 8: ...8 6 2 COMBINED WOOD ELECTRIC ...
Page 45: ...45 15 GENERAL ELECTRICAL DIAGRAM ...
Page 46: ...46 16 ELECTRICAL DIAGRAM FOR PARALLEL FURNACE ...
Page 47: ...47 17 ELECTRICAL DIAGRAM FOR ELECTRIC UNIT ...
Page 49: ...49 18 4 AIR CONDITIONNING DAMPER 18 5 HUMIDIFIER 18 6 HEAT PUMP ...
Page 50: ...50 19 EXPLODED VIEW AND PART LIST ...
Page 51: ...51 ...
Page 52: ...52 ...
Page 53: ...53 ...
Page 54: ...54 ...