INTRODUCTION
1-14
By the time the explorer frames arrives at the destination station, the route
it took to the destination, represented by the data in the RI field, can serve
as the map for all subsequent data-exchange between the source and
destination stations. The destination station reverses the route in the
explorer frame’s RI field and transmits it back to the source station, where
from then on it can be extracted from the source station’s SR-adaptor
memory and included with a Specifically Routed Frame (SRF) containing
both route information and the data for the destination station.
See the TRBMIM/TRBMIM-T Local Management User’s Guide for
information about working with the Bridge Setup application used to
establish SR bridging parameters.
1.6 RELATED MANUALS
This section lists Cabletron Systems manuals or sets of manuals included
with products typically used with the TRBMIM-T.
Multi-Media Access Center Overview and Set Up Guide (information
about setting up the MMAC)
TRBMIM/TRBMIM-T Local Management User’s Guide (information
about monitoring and managing the TRBMIM/TRBMIM-T; included
with your TRBMIM-T)
TRMM/TRMMIM Installation Guide (information about configuring
and installing the Token Ring management modules)
TRMM/TRMMIM Local Management User’s Guide (information about
monitoring and managing the Token Ring management modules)
TRMIM and TRRMIM Series Installation/User’s Guides (information
about configuring and installing active and passive the Token Ring Media
Interface Modules)
EMME and EMM-E6 Installation Guides (information about
configuring and installing the Ethernet management modules)
EMME and EMM-E6 Local Management User’s Guides (information
about monitoring and managing the Ethernet management modules)
TRBMIM-T BOOK Page 14 Tuesday, July 2, 1996 10:35 AM
Summary of Contents for TRBMIM-T
Page 1: ...TRBMIM T TOKEN RING BRIDGE MANAGEMENT MODULE USER S GUIDE BOOKTITLE2 OPTIONAL ...
Page 2: ......
Page 8: ...NOTICE vi ...
Page 26: ...INTRODUCTION 1 16 ...
Page 38: ...REQUIREMENTS AND SPECIFICATIONS 2 12 ...
Page 42: ...INSTALLATION 3 4 ...
Page 50: ...ESTABLISHING THE BRIDGE CONNECTION 4 8 ...
Page 62: ...MONITORING AND TROUBLESHOOTING 5 12 ...
Page 66: ...TPIM SPECIFICATIONS A 4 ...
Page 74: ...INDEX IX 4 ...