2H22-08R SmartSwitch 2208 User’s Guide
Page C-1
APPENDIX C
OPTIONAL INSTALLATIONS AND
MODE SWITCH BANK SETTINGS
The top cover must be removed to gain access to the mode bank switches
and to install the Fast Ethernet Interface Modules.
This appendix covers the following items:
•
Required tools (
Section C.1
)
•
Removing the chassis cover (
Section C.2
)
•
Locations, functions, and settings for the mode switches
(
Section C.2.1
)
•
Installing Optional Fast Ethernet Interface Modules (
Section C.3
)
C.1
REQUIRED TOOLS
You need the following tools to perform the procedures provided in this
appendix:
•
Antistatic wrist strap (provided)
•
Phillips screwdriver
ONLY QUALIFIED SERVICE PERSONNEL SHOULD
ATTEMPT THE FOLLOWING PROCEDURES.
NUR QUALIFIEZIERTE SERVICE PERSONNAL DIE
FOLGENDE PROCEDURE FOLGEN SOLLTEN.
SOLAMENTE PERSONAL CALIFICADO DEBE INTENTAR
ESTE PROCEDIMIENTO.